#46 |
Kansei DEMO
|
zengw@cse.ohio-state.edu
|
major
|
KANSEI: 1c2 Integrate Kansei researcher portal-
|
KANSEI
|
SPIRAL1
|
#282 |
Milestone S2.j completion
|
zengw@cse.ohio-state.edu
|
major
|
KANSEI: S2.j POC to GENI response team
|
KANSEI
|
SPIRAL1
|
#283 |
Milestone S2.1 completion
|
zengw@cse.ohio-state.edu
|
major
|
KANSEI: S2.i Collaborate with GMOC
|
KANSEI
|
SPIRAL1
|
#159 |
Document outreach activities
|
Yan_Luo@uml.edu
|
major
|
UMLPEN: GENI Outreach
|
UMLPEN
|
SPIRAL1
|
#1009 |
ION AM should report OSCARS errors in sliverstatus
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1010 |
ION AM should restrict requests to endpoints/vlans in the Ad
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1011 |
Support link_type and exclude non VLAN from stitching
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL5
|
#1015 |
Log slice creator, email when creating ION slices
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1016 |
SCS returns malformed VLAN range
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL5
|
#1017 |
Enforce capacity restrictions on requests
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1018 |
Errors running latest ION AM code
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1021 |
malformed request results in malformed manifest
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1026 |
getversion reports wrong ION URN
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1028 |
Support RenewSliver (API v2) method on ION AM
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1029 |
Enforce checking VLAN ID of stitching links in request RSpec
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1030 |
add geni_expires in sliverstatus reply
|
xyang@maxgigapop.net
|
minor
|
|
I2AM
|
SPIRAL5
|
#1034 |
SCS must handle 2 URLs in Ad RSpec
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL5
|
#1042 |
SCS hops from ION use v2 schema
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL5
|
#1043 |
Unable to renewsliver or get sliverstatus at internet2 aggregate for active slivers exchanging traffic
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL5
|
#1051 |
StitchingServiceFailedError no response received from computing core
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1055 |
Stitching from MAX to PG Utah fails with Internal API error at the I2 ION aggregate
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1159 |
Renewing stitched sliver with ION in path may result in OSCARS path modificaiton failure
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL6
|
#1195 |
Delete of sliver whose circuit on longer exists in MAX causes subsequent circuits to not complete
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL6
|
#1284 |
Speaks for broken at MAX and I2AM
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL6
|
#1292 |
ION/MAX AMs have wrong authority in sliver URN
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL6
|
#1349 |
SCS ignores excludeHops on one path when there are multiple paths
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL7
|
#1351 |
SCS: 2 hop path has no dependencies
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL7
|
#1352 |
SCS thinks link type vlan is not stitching
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL7
|
#1353 |
Unknown path reported for complex 9 site topology
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL7
|
#1358 |
I2 SCS does not recognize GPO endpoint
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL7
|
#1359 |
Allow requesting GENI stitching on ExoGENI only links
|
xyang@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL7
|
#1497 |
SCS page for Delegated GENI Stitching VLANs is no longer available
|
xyang@maxgigapop.net
|
major
|
|
GPO
|
SPIRAL8
|
#480 |
S2.a Completion
|
andyli
|
major
|
OKGEMS: S2.a Plan to integrate sensor nodes
|
OKGEMS
|
SPIRAL2
|
#481 |
Milestone S2.c Completion
|
andyli
|
major
|
OKGEMS: S2.c Integrate lab sensor nodes
|
OKGEMS
|
SPIRAL2
|
#498 |
Milestone S2.d Completion
|
andyli
|
major
|
OKGEMS: S2.d Integrate field sensor nodes
|
OKGEMS
|
SPIRAL2
|
#9 |
Milestone date change.
|
Vic Thomas
|
major
|
GushProto: v0.1 Implementation
|
GUSH
|
SPIRAL1
|
#10 |
Develop and document an approach to integration with one or more control frameworks.
|
Vic Thomas
|
major
|
MillionNodeGeni: VM Techniques
|
MILNGENI
|
SPIRAL1
|
#11 |
Adjust due date for design specification if necessary.
|
Vic Thomas
|
major
|
MeasurementSys: S1.b Measurement system design specification -
|
MeasurementSys
|
SPIRAL1
|
#12 |
Understand DOR better and discuss its use with the various control frameworks.
|
Vic Thomas
|
major
|
DigitalObjectRegistry: Plan to meet registry needs of at least one control framework.
|
DIGOBREG
|
SPIRAL1
|
#31 |
Possible change to milestone date
|
Vic Thomas
|
major
|
MeasurementSys: S1.c Repository system design specification -
|
GPO
|
SPIRAL1
|
#32 |
Possible change to milestone date.
|
Vic Thomas
|
major
|
MeasurementSys: S1.a System interface design specification -
|
GPO
|
SPIRAL1
|
#290 |
ABAC requirement milestone deliverable report
|
Vic Thomas
|
major
|
|
ABAC
|
SPIRAL2
|
#301 |
MetaVPN software is usable
|
Vic Thomas
|
major
|
|
GPO
|
SPIRAL2
|
#670 |
Milestone 3 completed
|
Vic Thomas
|
major
|
Attrib: S2.c
|
GPO
|
SPIRAL2
|
#686 |
satisfied late deliverable NETKARMA: S2.f experience report
|
Vic Thomas
|
major
|
|
GPO
|
SPIRAL2
|
#687 |
satisfied late deliverable NETKARMA: S2.g user doc
|
Vic Thomas
|
major
|
|
GPO
|
SPIRAL2
|
#688 |
satisfied late deliverable NETKARMA: S2.h prototype
|
Vic Thomas
|
major
|
|
GPO
|
SPIRAL2
|
#749 |
milestone 3.b completion
|
Vic Thomas
|
major
|
NETKARMA: S3.b Plan for making provenance information available to experimenters
|
NETKARMA
|
SPIRAL3
|
#765 |
Defined Wireless XML communication
|
Vic Thomas
|
major
|
CMU Lab:S2.b Define RSpecs for wireless channels
|
GPO
|
SPIRAL2
|
#779 |
Post GEC11 Status Report and Milestone
|
Vic Thomas
|
major
|
NETKARMA: S3.e GEC11 demonstration and outreach
|
GPO
|
SPIRAL3
|
#780 |
Netkarma Milestone Delivered, Wiki updated
|
Vic Thomas
|
major
|
NETKARMA: S3.f Deliver software and documentation
|
GPO
|
SPIRAL3
|
#941 |
NETKARMA: S4.c Provenance system demo; I&M contributions and GEC 14 Report
|
Vic Thomas
|
major
|
NETKARMA: S4.c Provenance system demo; I&M contributions
|
GPO
|
SPIRAL4
|
#760 |
Document for milestone S3.d as requested by Vic Thomas
|
Vicraj Thomas <vthomas@bbn.com>
|
major
|
NETKARMA: S3.d Updated plan for making provenance information available to experimenters
|
GPO
|
SPIRAL3
|
#899 |
SOXREGIONAL: S4.b Deploy switch and connections to Clemson and Georgia Tech
|
tupty@bbn.com
|
major
|
SOXREGIONAL: S4.b Deploy switch and connections to Clemson and Georgia Tech
|
SOXREGIONAL
|
SPIRAL4
|
#1201 |
Sign CSR for omf_job_service at umass.edu.au
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1202 |
Sign CSR for omf_job_service for local testing
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1208 |
Sign CSR for GeniDesktop at University of Kentucky
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1210 |
Sign CSR for collector at gpo
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1212 |
Sign CSR for TOOL collector for INSTANCE jfed-iminds
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1213 |
Sign CSR for collector at max_ops_mon_localstore
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1216 |
Sign CSR for genicollector at uky
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1219 |
Sign CSR for vmcount at gpo
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1250 |
Sign CSR for ExoGENI generic collector cert
|
tmitchel@bbn.com
|
blocker
|
|
GPO
|
SPIRAL6
|
#1269 |
Sign CSR for GENI ION AM Ops-Monitoring at ION AM/GMOC
|
tmitchel@bbn.com
|
minor
|
|
GPO
|
SPIRAL6
|
#1469 |
Sign CSR for VTS at UIUC
|
tmitchel@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1013 |
tag and formally release the ION AM software
|
tlehman@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1014 |
Change units on capacity in stitching extension
|
tlehman@maxgigapop.net
|
major
|
|
MAXSCS
|
SPIRAL5
|
#462 |
Demo request for UMLPEN
|
timficarra@gmail.com
|
major
|
|
UMLPEN
|
SPIRAL2
|
#548 |
Milestone S2.a completion
|
suman@cs.wisc.edu
|
major
|
WIMXUWI: S2.a Initial integration of static and mobile nodes in MadBed testbed with ORBIT
|
WIMXUWI
|
SPIRAL2
|
#276 |
Providing CM for VLAN creation on backbone switches to other projects
|
Leigh Stoller
|
major
|
ProtoGENI.S2.e: ProtoGENI backbone resources available to other clusters
|
GPO
|
SPIRAL1
|
#26 |
Provide new completion date for report.
|
Stephen.Schwab@sparta.com
|
major
|
SECARCH: S1.a Draft Security Design Report
|
SECARCH
|
SPIRAL1
|
#44 |
Deliver final draft of Security document.
|
Stephen.Schwab@sparta.com
|
major
|
SECARCH: S1.a Draft Security Design Report
|
SECARCH
|
SPIRAL1
|
#107 |
Hold discussions with GMOC on security for initial data sharing
|
Stephen.Schwab@cobham.com
|
major
|
SECARCH: S1.b Security Contributions to GMOC documents
|
GPO
|
SPIRAL1
|
#169 |
Work in progress for this report
|
Stephen.Schwab@cobham.com
|
major
|
SECARCH: S1.c Revised Security Design Report
|
SECARCH
|
SPIRAL1
|
#432 |
Steve Schwab to determine if more info is needed from INSTOOLS for security review.
|
Stephen.Schwab@cobham.com
|
major
|
INSTOOLS: S2.c Provide project draft input to GENI Spiral Security Review 2
|
SECARCH
|
SPIRAL2
|
#434 |
Confirm Sparta has all inputs needed from BGP-MUX for Spriral 2 security review.
|
Stephen.Schwab@cobham.com
|
major
|
BGPMux: S2.f Security review 2
|
SECARCH
|
SPIRAL2
|
#1 |
CMU Lab: bare bones node configuration complete
|
somebody
|
major
|
CMU Lab: bare bones node configuration
|
CMULAB
|
SPIRAL1
|
#4 |
CMU Lab: integrate emulator nodes
|
somebody
|
major
|
CMU Lab: emulator nodes integrated
|
CMULAB
|
SPIRAL1
|
#5 |
Deliver user study
|
somebody
|
major
|
GushProto: User Study
|
GUSH
|
SPIRAL1
|
#67 |
Progress on software release milestone
|
somebody
|
major
|
TIED: S1.c Release v 0.1 of component manager and clearinghouse.
|
TIED
|
SPIRAL1
|
#68 |
Post Opt-in requirements document
|
somebody
|
major
|
REGOPT: S1.a Produce opt-in requirements document
|
GPO
|
SPIRAL1
|
#76 |
Change in milestone date.
|
somebody
|
major
|
GushProto: GEC Demo -
|
GPO
|
SPIRAL1
|
#85 |
modify milestone to add an extra protoGENI node to I2 in Spiral 1
|
somebody
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
GPO
|
SPIRAL1
|
#111 |
Publish version of Common Operational Dataset that incorporates feedback from control framework projects
|
somebody
|
major
|
GMOC:Define Common Operational Dataset
|
GMOC
|
SPIRAL1
|
#112 |
Feedback from ProtoGENI on Common Operational Dataset
|
somebody
|
major
|
GMOC:Define Common Operational Dataset
|
GMOC
|
SPIRAL1
|
#125 |
Dataplane tunnelling 4a
|
somebody
|
major
|
CMU Lab: integration of node-CMU and CMU-Utah tunnels
|
GPO
|
SPIRAL1
|
#126 |
Dataplane tunnelling 4b
|
somebody
|
major
|
CMU Lab: integration of node-CMU and CMU-Utah tunnels
|
GPO
|
SPIRAL1
|
#161 |
modify milestone to add an extra protoGENI node to I2 in Spiral 1
|
somebody
|
major
|
SPP: Deploy three SPP nodes -
|
SPP
|
SPIRAL1
|
#166 |
Discuss security architecture for GMOC data sharing with SPARTA.
|
somebody
|
major
|
GMOC: S1.a.d Integrate Security services in GMOC framework
|
GPO
|
SPIRAL1
|
#170 |
Presented Opt-In requrements at GEC4 Opt-in Working Group meeting.
|
somebody
|
major
|
REGOPT: S1.a Produce opt-in requirements document
|
GPO
|
SPIRAL1
|
#178 |
schedule workshop
|
somebody
|
major
|
ENTGENI: Host OpenFlow workshop at Stanford
|
GPO
|
SPIRAL1
|
#215 |
Document integrated experimentation
|
somebody
|
major
|
CMU Lab: Integrated experimentation between CMU testbeds
|
GPO
|
SPIRAL1
|
#217 |
SPP arch doc
|
somebody
|
major
|
SPP: Architecture and Design Documentation (Draft)
|
GPO
|
SPIRAL1
|
#218 |
Deploy three SPP nodes
|
somebody
|
major
|
SPP: Deploy three SPP nodes -
|
GPO
|
SPIRAL1
|
#242 |
GEC6: Enterprise GENI demo
|
somebody
|
major
|
|
ENTGENI
|
SPIRAL1
|
#245 |
contribute to GpENI outreach
|
somebody
|
major
|
GpENI: Testbed available for limited external research
|
GPO
|
SPIRAL1
|
#246 |
GpENI: S2.d access
|
somebody
|
major
|
GpENI: S2.d access
|
GPO
|
SPIRAL2
|
#247 |
update gpeni to latest geniwrapper
|
somebody
|
major
|
GpENI: S2.a new geniwrapper
|
GPO
|
SPIRAL2
|
#249 |
GpENI: S2.b study DCN in GpENI
|
somebody
|
major
|
GpENI: S2.b study DCN in GpENI
|
GPO
|
SPIRAL2
|
#254 |
SECUREUPDATES: S2.a overview
|
somebody
|
major
|
SECUREUPDATES: S2.a overview
|
GPO
|
SPIRAL2
|