#173 |
Second SPP node preparing to ship
|
hdempsey@bbn.com
|
major
|
SPP: Deploy three SPP nodes -
|
SPP
|
SPIRAL1
|
#174 |
confirm CMUlab control plane integration
|
dga@cs.cmu.edu
|
major
|
CMU Lab: integrate with ProtoGENI control plane
|
GPO
|
SPIRAL1
|
#175 |
Schedule demo of EnterPrise GENI with PlanetLab.
|
appenz@cs.stanford.edu
|
major
|
ENTGENI: S1.d Demonstrate OpenFlow in GENI
|
ENTGENI
|
SPIRAL1
|
#176 |
Document plan for VLAN integration
|
Srini Seetharaman
|
major
|
ENTGENI: S1.c Integrate EntGENI with GENI virtual ethernets
|
GPO
|
SPIRAL1
|
#177 |
complete timeline and plan for intgration between EntGENI and GENI PlanetLab clearinghouse/control framework
|
Srini Seetharaman
|
major
|
ENTGENI: S1.b Start integrating interfaces from ENTGENI AM to Clearinghouse
|
GPO
|
SPIRAL1
|
#178 |
schedule workshop
|
somebody
|
major
|
ENTGENI: Host OpenFlow workshop at Stanford
|
GPO
|
SPIRAL1
|
#179 |
Provide plan for making Aggregate Manager externally accessible in Phase 0 deployment
|
Srini Seetharaman
|
major
|
ENTGENI: S1.a Deploy Phase 0 Enterprise GENI network at Stanford
|
GPO
|
SPIRAL1
|
#180 |
Milestone revision for clarity, due date change
|
Aaron Falk
|
major
|
BGPMux: Define RSpec -
|
BGPMUX
|
SPIRAL1
|
#181 |
Define ProtoGENI RSpec for BGP Mux and tunnels
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Define RSpec -
|
BGPMUX
|
SPIRAL1
|
#182 |
Milestone revision for clarity, due date change
|
Aaron Falk
|
major
|
BGPMux: Integrate with ProtoGENI -
|
BGPMUX
|
SPIRAL1
|
#183 |
Milestone date change
|
Aaron Falk
|
major
|
BGPMux: Make BGP mux and tunnel software available -
|
BGPMUX
|
SPIRAL1
|
#184 |
initial how-to draft available
|
Aaron Falk
|
major
|
BGPMux: Virtual Network with BGPMux How-To --
|
BGPMUX
|
SPIRAL1
|
#185 |
Make prototype available to GENI researchers
|
chris@maxgigapop.net
|
major
|
MAX: Make a working prototype
|
MAX
|
SPIRAL1
|
#186 |
Integrate DRAGON with a GENI CF
|
chris@maxgigapop.net
|
major
|
MAX: Integrate DRAGON/GENI control framework
|
MAX
|
SPIRAL1
|
#187 |
Integrate DRAGON/GENI CF with DRAGON testbed
|
chris@maxgigapop.net
|
major
|
MAX: Integrate DRAGON/GRMS
|
GPO
|
SPIRAL1
|
#188 |
Third SPP node shipped
|
Josh Karlin
|
major
|
SPP: Deploy three SPP nodes -
|
SPP
|
SPIRAL1
|
#189 |
WASH I2 node install
|
Josh Karlin
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
PROTOGENI
|
SPIRAL1
|
#190 |
MAX outreach
|
poneil@maxgigapop.net
|
major
|
|
GPO
|
SPIRAL1
|
#191 |
Verify that users are able to access DETER resources to run TIED experiments.
|
hdempsey@bbn.com
|
major
|
TIED: S1.e Provide user access to DETER via TIED.
|
GPO
|
SPIRAL1
|
#192 |
Demonstrate VLAN connectivity to/from TIED testbeds.
|
hdempsey@bbn.com
|
major
|
TIED: S1.h Provide direct VLAN interface to TIED resources
|
TIED
|
SPIRAL1
|
#193 |
MAX connection over I2 to ProtoGENI
|
chris@maxgigapop.net
|
major
|
|
MAX
|
SPIRAL1
|
#194 |
Complete OpenFlow workshop
|
nickm@stanford.edu
|
major
|
ENTGENI: Host OpenFlow workshop at Stanford
|
GPO
|
SPIRAL1
|
#195 |
SALT install
|
Josh Karlin
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
PROTOGENI
|
SPIRAL1
|
#196 |
MAX outreach
|
chris@maxgigapop.net
|
major
|
MAX: Specific contribution to GENI outreach
|
GPO
|
SPIRAL1
|
#197 |
KANS I2 install
|
Josh Karlin
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
PROTOGENI
|
SPIRAL1
|
#198 |
Complete control plane integration of three Spiral 1 backbone nodes
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: Control Plane integration of backbone nodes
|
GPO
|
SPIRAL1
|
#199 |
Complete L2 control of I2 nodes.
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: L2 control in backbone nodes
|
GPO
|
SPIRAL1
|
#200 |
Verify cluster mates have needed CF support
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: control plane integration of cluster-mates
|
GPO
|
SPIRAL1
|
#201 |
Extend BGP-Mux software release to include ProtoGENI compatible Aggregate Manager
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Make BGP mux and tunnel software available -
|
GPO
|
SPIRAL1
|
#202 |
No carrier on ProtoGENI HP switch port A19 at I2 SALT
|
chsmall@indiana.edu
|
major
|
|
PROTOGENI
|
SPIRAL1
|
#203 |
KANS SPP having problems
|
jdd@arl.wustl.edu
|
major
|
SPP: Deploy three SPP nodes -
|
PLANETLAB
|
SPIRAL1
|
#204 |
need documentation of milestone completion
|
prs@cs.cmu.edu
|
major
|
CMU Lab: student testbed use
|
GPO
|
SPIRAL1
|
#205 |
Completion of initial GMOC framework demostration.
|
somebody
|
major
|
GMOC: S1.b Demonstrate initial GMOC Framework Implementation at a GEC
|
GPO
|
SPIRAL1
|
#206 |
Completion of initial GMOC framework demostration milestone.
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b Demonstrate initial GMOC Framework Implementation at a GEC
|
GPO
|
SPIRAL1
|
#207 |
Completion of initial GMOC Dataset Translater Implementation
|
hdempsey@bbn.com
|
major
|
GMOC: S1.a.a Complete initial GMOC Operational Dataset Translater Implementation
|
GPO
|
SPIRAL1
|
#208 |
Competion of milestone initial GMOC Data Exchanger Implementation
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.b Complete initial GMOC Data Exchanger Implementation
|
GPO
|
SPIRAL1
|
#209 |
Milestone completion: Complete initial implementation of prototype GMOC
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.c Complete initial implementation of prototype GMOC
|
GPO
|
SPIRAL1
|
#210 |
Completion of Milestone Emergency Stop and Notifications.
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.d Complete initial implementation of Emergency Stop and notifications
|
GPO
|
SPIRAL1
|
#211 |
Competion of task: Draft GENI Concept of Operations
|
hdempsey@bbn.com
|
major
|
GMOC: S1.a Draft GENI Concept of Operations
|
GPO
|
SPIRAL1
|
#212 |
Milestone MAX: Delivery of preliminary design doc
|
chris@maxgigapop.net
|
major
|
MAX: Delivery of preliminary design doc
|
GPO
|
SPIRAL1
|
#213 |
Integration and Documentation proceeding
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.c Integrate and Document Instrumentation Toolset
|
GPO
|
SPIRAL1
|
#214 |
Provide pointer to AM and tools software and information on how GENI community may request access UKY aggregate.
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.d Deploy AM and open UKY Edulab for GENI
|
GPO
|
SPIRAL1
|
#215 |
Document integrated experimentation
|
somebody
|
major
|
CMU Lab: Integrated experimentation between CMU testbeds
|
GPO
|
SPIRAL1
|
#216 |
Plan for GEC6 demonstrations
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#217 |
SPP arch doc
|
somebody
|
major
|
SPP: Architecture and Design Documentation (Draft)
|
GPO
|
SPIRAL1
|
#218 |
Deploy three SPP nodes
|
somebody
|
major
|
SPP: Deploy three SPP nodes -
|
GPO
|
SPIRAL1
|
#219 |
milestone 1f completion
|
hmussman@bbn.com
|
major
|
DOME: 1f Demo basic virtualization and experiment control functions
|
DOME
|
SPIRAL1
|
#220 |
Plan for GEC6 demos
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#221 |
Million node GENI demo for GEC6
|
NIDHI
|
major
|
|
MILNGENI
|
SPIRAL2
|
#223 |
Demonstration of Supercharged Planetlab Platforms (SPP) for GEC6
|
NIDHI
|
major
|
|
SPP
|
SPIRAL1
|
#224 |
milestone 1f completion
|
Ivan Seskar
|
major
|
WiMAX: 1f VLAN connections to the GENI backbone network
|
WIMAX
|
SPIRAL1
|
#225 |
Raven GEC6 demo
|
NIDHI
|
major
|
|
RAVEN
|
SPIRAL1
|
#227 |
BGP-Mux demo
|
NIDHI
|
major
|
|
BGPMUX
|
SPIRAL1
|
#228 |
GEC6 Demo Request
|
NIDHI
|
major
|
|
VMI-FED
|
SPIRAL2
|
#229 |
Create mailing list for new Instrumentation and Measurement Working Group
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#230 |
difficulty entering text into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#231 |
batch entry of milestones into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#232 |
Digital Object Repository in GENI
|
NIDHI
|
major
|
DIGOBREG: S2.a Host a Digital Object Repository service
|
DIGOBREG
|
SPIRAL2
|
#233 |
ProtoGENI demo at GEC#6
|
NIDHI
|
major
|
|
PROTOGENI
|
SPIRAL1
|
#234 |
ERM poster/demo for GEC6
|
NIDHI
|
major
|
|
ERM
|
SPIRAL1
|
#235 |
UMLPEN GEC6 demo request
|
NIDHI
|
major
|
|
UMLPEN
|
SPIRAL1
|
#236 |
KanseiGenie poster/demo
|
NIDHI
|
major
|
|
KANSEI
|
SPIRAL1
|
#237 |
ViSE GEC6 Demo
|
NIDHI
|
major
|
|
VISE
|
SPIRAL1
|
#238 |
PlanetLab Demo
|
NIDHI
|
major
|
|
PLANETLAB
|
SPIRAL2
|
#239 |
GMOC GEC6 demo requiremetns
|
NIDHI
|
major
|
|
GMOC
|
SPIRAL1
|
#240 |
ORCA-BEN Demo at GEC6
|
NIDHI
|
major
|
|
ORCABEN
|
SPIRAL2
|
#241 |
NetKarma GEC6 Demo/Poster
|
NIDHI
|
major
|
|
NETKARMA
|
SPIRAL2
|
#242 |
GEC6: Enterprise GENI demo
|
somebody
|
major
|
|
ENTGENI
|
SPIRAL1
|
#243 |
GEC6: CMU Demo
|
NIDHI
|
major
|
|
CMULAB
|
SPIRAL1
|
#244 |
log wg mail list passwords
|
somebody
|
major
|
|
GPO
|
SPIRAL2
|
#245 |
contribute to GpENI outreach
|
somebody
|
major
|
GpENI: Testbed available for limited external research
|
GPO
|
SPIRAL1
|
#246 |
GpENI: S2.d access
|
somebody
|
major
|
GpENI: S2.d access
|
GPO
|
SPIRAL2
|
#247 |
update gpeni to latest geniwrapper
|
somebody
|
major
|
GpENI: S2.a new geniwrapper
|
GPO
|
SPIRAL2
|
#248 |
ETRI Virtualized Programmable Plaftorm Demo
|
NIDHI
|
major
|
|
KGENI
|
SPIRAL2
|
#249 |
GpENI: S2.b study DCN in GpENI
|
somebody
|
major
|
GpENI: S2.b study DCN in GpENI
|
GPO
|
SPIRAL2
|
#250 |
SPP GPE Board failure at Salt Lake City Pop
|
chsmall@grnoc.iu.edu
|
major
|
|
SPP
|
SPIRAL1
|
#251 |
GEC 6: Instrumentation tools demo request
|
NIDHI
|
major
|
|
INSTOOLS
|
SPIRAL2
|
#252 |
wiki login for Michael Freedman @ Princeton, password help
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#253 |
GEC 6 demo: easel request for SCAFFOLD
|
NIDHI
|
major
|
|
SCAFFOLD
|
SPIRAL2
|
#254 |
SECUREUPDATES: S2.a overview
|
somebody
|
major
|
SECUREUPDATES: S2.a overview
|
GPO
|
SPIRAL2
|
#255 |
NetKarma White Paper
|
chris@bbn.com
|
major
|
|
NETKARMA
|
SPIRAL2
|
#257 |
VMI-FED S2.a demo VIX at GEC6
|
somebody
|
major
|
VMI-FED: S2.a VIX demo
|
GPO
|
SPIRAL2
|
#258 |
Ops transition requires better ProtoGENI integration
|
valas@gatech.edu
|
major
|
|
BGPMUX
|
SPIRAL2
|
#259 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
DOME: S2.a Complete integration with broker in clearinghouse
|
DOME
|
SPIRAL2
|
#260 |
Milestone S2.b completion
|
hmussman@bbn.com
|
major
|
DOME: S2.b Cluster plan for VLANs between testbeds
|
DOME
|
SPIRAL2
|
#261 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
|
VISE
|
SPIRAL1
|
#262 |
Milestone S2.b completion
|
hmussman@bbn.com
|
major
|
|
VISE
|
SPIRAL2
|
#263 |
S2.d milestone completion
|
hmussman@bbn.com
|
major
|
ViSE: S2.d Cluster plan for VLANs between testbeds
|
VISE
|
SPIRAL2
|
#264 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
ViSE: S2.a Complete Xen sensor slivering
|
VISE
|
SPIRAL2
|
#265 |
Milestone S2.b completion
|
hmussman@bbn.com
|
major
|
ViSE: S2.b Complete integration with broker in clearinghouse
|
VISE
|
SPIRAL2
|
#266 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
DICLOUD: S2.a Cluster plan for VLANs between testbeds
|
DICLOUD
|
SPIRAL2
|
#267 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
LEARN: S2.a Cluster plan for VLANs between testbeds
|
LEARN
|
SPIRAL1
|
#268 |
Milestone S2.b completion
|
somebody
|
major
|
|
LEARN
|
SPIRAL2
|
#269 |
Milestone S2.b completion
|
somebody
|
major
|
LEARN: S2.b Plan for VLANs on LEARN
|
LEARN
|
SPIRAL2
|
#270 |
Milestone S2.h completion
|
hmussman@bbn.com
|
major
|
LEARN: S2.h Draft measurement data file format
|
LEARN
|
SPIRAL1
|
#271 |
Milestone S2.c completion
|
hmussman@bbn.com
|
major
|
ViSE: S2.c Deliver first release of ViSE software
|
VISE
|
SPIRAL1
|
#272 |
ProtoGENI security POC identified
|
ricci@cs.utah.edu
|
major
|
ProtoGENI.S2.a: Security POC
|
GPO
|
SPIRAL1
|
#273 |
ProtoGENI Component/Aggregate Manager API V2 Document
|
ricci@cs.utah.edu
|
major
|
PGINTEGRN: S2.a API document
|
GPO
|
SPIRAL1
|
#274 |
SPP GPE Board failure at Washington DC Pop
|
Vic Thomas
|
major
|
|
SPP
|
SPIRAL1
|
#275 |
Due date change for milestone BGP-Mux: S2.c ops transition
|
somebody
|
major
|
BGPMux: S2.c BGP-Mux ops transition -
|
BGPMUX
|
SPIRAL1
|