Milestone IMF: S3.c Demonstration at GEC10 and Experimenter Outreach

Completed 13 years ago (03/15/11 15:15:48)

100%

Total number of tickets: 2 - closed: 2 - active: 0

GPO

1 / 1

IMF

1 / 1

  • Integrate and install perfSONAR (pS) MPs and archives to collect performance measurement data from Polatis switches and Infinera DWDM platforms on 4 BEN sites. Demonstrate at GEC10.
  • NOTE: This presupposes that pS skeleton MP code is made available by 12/31/10 by the pS project. This is beyond the direct control of personnel on the IMF project. If pS skeleton MP code is not available, then this milestone slides to GEC11.