Milestone IMF: S3.c Demonstration at GEC10 and Experimenter Outreach
- Integrate and install perfSONAR (pS) MPs and archives to collect performance measurement data from Polatis switches and Infinera DWDM platforms on 4 BEN sites. Demonstrate at GEC10.
- NOTE: This presupposes that pS skeleton MP code is made available by 12/31/10 by the pS project. This is beyond the direct control of personnel on the IMF project. If pS skeleton MP code is not available, then this milestone slides to GEC11.