Timeline
06/28/12:
- 12:05 Ticket #3 (Main page only shows one node (PCA)) closed by
- fixed: Verified fix with latest scripts checked into GENI-GEMINI/UW …
- 12:03 Ticket #2 (All graphs button shows no graphs for 2/3 nodes) closed by
- fixed: Verified fix with latest scripts checked into GENI-GEMINI/UW …
06/21/12:
- 15:42 Ticket #4 (Investigate bottlenecks in instrumentize process) created by
- The instrumentize script is reportedly taking about 30 minutes to …
- 12:35 Ticket #3 (Main page only shows one node (PCA)) created by
- Using the same 4-node slice with MPs PCA, PCB, and PCC. When I click …
- 12:33 Ticket #2 (All graphs button shows no graphs for 2/3 nodes) created by
- I set up a slice with 1 GN and 3 MPs (PCA, PCB, PCC). When I select …
06/11/12:
- 21:30 WikiStart edited by
- (diff)
- 21:22 WikiStart edited by
- (diff)
- 20:52 Ticket #1 (Test GEMINI ticket) created by
- This is a ticket to test the GEMINI trac instance.
Note: See TracTimeline
for information about the timeline view.