Changes between Version 4 and Version 5 of _GIMI_NextSteps
- Timestamp:
- 04/27/12 12:05:56 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
_GIMI_NextSteps
v4 v5 33 33 34 34 a) (Mike) need to arrive at nominal configuration ASAP 35 on 4/18: good discussion (see below); still need a clear and complete description soon; when?36 on 4/25: discussion as noted below; still need a clear and complete description soon, and a full design review; when?35 - on 4/18: good discussion (see below); still need a clear and complete description soon; when? 36 - on 4/25: discussion as noted below; still need a clear and complete description soon, and a full design review; when? 37 37 38 38 a') on 4/20: issue: how to configure MPs/MCs? from EC to RC in MP/MC? 39 39 40 40 a!'') on 4/20: issue: is there a MAP on common node? at least to preview data? is there a MAP in user workspace? what? 41 on 4/25: for 1st, no MAP on common node41 - on 4/25: for 1st, no MAP on common node 42 42 43 43 b) MPs with multiple possible measurements: host info; basic network performance with iperf, ping; data from app 44 on 4/25: need to list baseline measurements, and configurable parameters44 - on 4/25: need to list baseline measurements, and configurable parameters 45 45 46 46 c) MC (OML server) in common node (node n+1) 47 47 48 48 d) where is MAP service installed? in common node? in user workspace? what is planned for this service? how can analysis/presentation be configured? is there an r script? is there a GUI? how is GUI accessed? 49 on 4/25: for 1st, expect MAP only bin user workspace50 on 4/25: what is 1st MAP service? what functions are provided? can these be done using iREEL and r?49 - on 4/25: for 1st, expect MAP only bin user workspace 50 - on 4/25: what is 1st MAP service? what functions are provided? can these be done using iREEL and r? 51 51 52 52 e) movement of data from MC (OML server) to MAP service: direct? how? via iRODS, i.e., MC to iRODS to MAP? how? 53 on 4/18, per Shu, and discussion: could login to MC node; establish first transfer from iRODS client on MC to to iRODS with iput; use iinit, so iRODS client remembers password; then periodic transfers with no human intervention; another push protocol, from MC to iRODS.54 on 4/18, per Shu, and discussion: next, can install iRODS client on user workspace, then pull data back to user workspace for analysis and presentation, and then push back to iRODS for archive53 - on 4/18, per Shu, and discussion: could login to MC node; establish first transfer from iRODS client on MC to to iRODS with iput; use iinit, so iRODS client remembers password; then periodic transfers with no human intervention; another push protocol, from MC to iRODS. 54 - on 4/18, per Shu, and discussion: next, can install iRODS client on user workspace, then pull data back to user workspace for analysis and presentation, and then push back to iRODS for archive 55 55 56 56 f) 1st: common node in slice; 2nd: common node in user workspace (out of slice) (is this beyond GEC14?) 57 on 4/25: for 1st, do common node in slice, but plan one per aggregate57 - on 4/25: for 1st, do common node in slice, but plan one per aggregate 58 58 59 59 g) 1st: nodes on VMs, one aggregate; 2nd: nodes on VMs, multiple aggregates 60 60 61 61 h) 1st: Load image for common node, MP nodes; 2nd: load MP code as package before/after app 62 on 4/25: what is test app? need to have something visible, e.g., video to a web page?62 - on 4/25: what is test app? need to have something visible, e.g., video to a web page? 63 63 64 64 i) Is there authentication/authorization when data pushed fom MP to MC? 1st: none; considered OK 2nd: add ssl? 65 65 66 66 j) Is there authentication/authorization when accessing GUI (MAP) on common node? how? does this use portal to GUIs? 67 on 4/25: not in 1st67 - on 4/25: not in 1st 68 68 69 69 == 4) *** Introduce XML messaging service: required for OMF messages, used to orchestrate services == … … 72 72 73 73 b) (Max, Christoph) signed OMF messages: need summary of arrangement from NICTA. what are names? who configures pub/sub nodes? what is structure? how to generate and distribute keys? is a public key registry required? how would it be done? 74 on 4/18: Max explains plan to use OMF6.0 approach; limited messages; can use XMPP or another transport; signed messages; can start with no authentication/authorization, and then turn it on later;75 on 4/18: need clear and complete description soon, particularly naming and establsihment of XMPP nodes. so that others can consider for use and Jeanne can begin testing.76 on 4/18: expect release of first OMF6.0 by mid-May, with firm RC and skeleton EC; expect updated EC by mid-June; is this too late for GEC14?77 on 4/25: need to start with an earlier version of OMF, e.g., OMF 5.374 - on 4/18: Max explains plan to use OMF6.0 approach; limited messages; can use XMPP or another transport; signed messages; can start with no authentication/authorization, and then turn it on later; 75 - on 4/18: need clear and complete description soon, particularly naming and establsihment of XMPP nodes. so that others can consider for use and Jeanne can begin testing. 76 - on 4/18: expect release of first OMF6.0 by mid-May, with firm RC and skeleton EC; expect updated EC by mid-June; is this too late for GEC14? 77 - on 4/25: need to start with an earlier version of OMF, e.g., OMF 5.3 78 78 79 79 == 5) Tools in user workspace == … … 90 90 91 91 f) (Christoph) Add iREEL (experimenter portal service); 92 on 4/25: what can this do? can it provide MAP functions? can it drive scripts? (need copy to run locally)92 - on 4/25: what can this do? can it provide MAP functions? can it drive scripts? (need copy to run locally) 93 93 94 94 g) (From GEMINI; under discussion) Include portal service to find other GUIs? 95 on 4/25: for 1st, not necessary95 - on 4/25: for 1st, not necessary 96 96 97 97 h) (Giridhar, Jeanne, Shu) Include Directory Archive (DA) service ,which can push data to DOA service, using OI service (all from CNRI, also GPO ) 98 on 4/25: now replaced with iRODS client98 - on 4/25: now replaced with iRODS client 99 99 100 100 i) (Giridhar, Jeanne, Shu) Include MDOD creator/editor How does this interface with iRODS, ot push MDOD to iRODS? 101 on 4/18: who on GIMI project will help define final MDOD schema? Shu.102 on 4/25: need to get group together, to revise MDOD schema, and consider implementation of creator/editor101 - on 4/18: who on GIMI project will help define final MDOD schema? Shu. 102 - on 4/25: need to get group together, to revise MDOD schema, and consider implementation of creator/editor 103 103 104 104 … … 116 116 117 117 d) (Shu) define use case for: moving data from MC to iRODS, then from iRODS to user workspace 118 use iRODS cleint in MC to push to iRODS? how is authentication/authorization handled?119 use iRODS client in user workspace to pull to user workspace? how is authentication/authorization handled?118 - use iRODS cleint in MC to push to iRODS? how is authentication/authorization handled? 119 - use iRODS client in user workspace to pull to user workspace? how is authentication/authorization handled? 120 120 121 121 On 4/18: use cases received: … … 174 174 175 175 c) (Mike) What is first configuration of tools code? when? who? 176 on 4/18: plan to forward all code and plans for GEC13 to Jeanne177 on 4/18: code leads are David and Delip; will join future calls176 - on 4/18: plan to forward all code and plans for GEC13 to Jeanne 177 - on 4/18: code leads are David and Delip; will join future calls 178 178 179 179 d) (Jeanne) What are first test scripts? when? 180 on 4/25: need to outline process for using tools in user workspace181 on 4/25: need to provide first test plan180 - on 4/25: need to outline process for using tools in user workspace 181 - on 4/25: need to provide first test plan 182 182 183 183 e) (Jeanne) When are first tests? … … 200 200 201 201 a) (Mike, Cong) Can we do something by GEC14? what? 202 on 4/25: agree UMass Amherst WiMAX site should be up by GEC14203 on 4/25: agree should have plan to integrate GIMI with WiMAX by GEC14, but does not need to be done202 - on 4/25: agree UMass Amherst WiMAX site should be up by GEC14 203 - on 4/25: agree should have plan to integrate GIMI with WiMAX by GEC14, but does not need to be done