Changes between Version 4 and Version 5 of WiMAXSiteDeployments


Ignore:
Timestamp:
03/14/13 15:47:33 (11 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXSiteDeployments

    v4 v5  
     1[[PageOutline]]
     2
    13= Status of GENI WiMAX Site Deployments =
    24
     
    1214
    1315
    14 == 3)  GENI WiMAX site deployment status and local experiment plans ==
    15 3:15pm  [[BR]]
     16== 4)  GENI WiMAX site deployment status and local experiment plans ==
     17
    1618
    1719Each site will indicate:  [[BR]]
    1820
    19 a)  Status of deployments planned for Spiral 4:  [[BR]]
    20 
    21 b)  Plan for local research experiments in Spiral 5:  [[BR]]
    22 
    23 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:  [[BR]]
    24 
    25 d)  Support for unified GENI operations:  [[BR]]
    26 
    27 e)  Support for experiments:  [[BR]]
    28 
    29 
    30 === 3.1)  BBN Site Extension Plan ===
    31 3:15pm  [[BR]]
    32 Manu Gosain (GPO)  [[BR]]
    33 
    34 GEC14 status:  [[BR]]
    35  [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/BBNStatus%200710wimaxmeeting14gec.ppt slide]  [[BR]]
    36 
    37 GEC15 status:  [[BR]]
    38 a)  Status of deployments planned for Spiral 4:  [[BR]]
    39  Get experimental frequency from the FCC, that does not interfere with Clearwire services   (yes, new frequency) [[BR]]
    40  Install Airspan base station(s), with local NetSpan management system   (yes) [[BR]]
    41  Add OMF/OML structures, including LoginService  (yes)  [[BR]]
    42  Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
    43  WiFi access point for dual-homing operating on custom PC node  (partial)  [[BR]]
    44  Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
    45 
    46 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    47  Repeat throughput and range, comparing NEC and Airspan [[BR]]
    48 
    49 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    50  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    51  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    52  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    53  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    54  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    55  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    56  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    57 
    58 d)  Support for unified GENI operations:  [[BR]]
    59  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    60  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    61  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    62 
    63 e)  Support for experiments:  [[BR]]
    64  Local research experiments [[BR]]
    65  Experiments by remote experimenters, including those at tutorials  [[BR]]
    66  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    67  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    68 
    69 
    70 
    71 === 3.2)  WINLAB/Rutgers University Site Extension Plan ===
    72 3:20pm  [[BR]]
     21 Support for unified GENI operations:  [[BR]]
     22 Status of deployments planned for Spiral 4 and Spiral 5:  [[BR]]
     23 Plan for local research experiments in Spiral 5:  [[BR]]
     24 Support for experiments:  [[BR]]
     25
     26
     27=== 4.1)  WINLAB/Rutgers University Site Extension Plan ===
     28
    7329Ivan Seskar (WINLAB) [[BR]]
    7430
     
    12177
    12278
    123 
    124 === 3.3)  UCLA Site Extension Plans ===
    125 3:25pm  [[BR]]
     79=== 4.2)  BBN Site Extension Plan ===
     80
     81Manu Gosain (GPO)  [[BR]]
     82
     83GEC14 status:  [[BR]]
     84 [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/BBNStatus%200710wimaxmeeting14gec.ppt slide]  [[BR]]
     85
     86GEC15 status:  [[BR]]
     87a)  Status of deployments planned for Spiral 4:  [[BR]]
     88 Get experimental frequency from the FCC, that does not interfere with Clearwire services   (yes, new frequency) [[BR]]
     89 Install Airspan base station(s), with local NetSpan management system   (yes) [[BR]]
     90 Add OMF/OML structures, including LoginService  (yes)  [[BR]]
     91 Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
     92 WiFi access point for dual-homing operating on custom PC node  (partial)  [[BR]]
     93 Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
     94
     95b)  Plan for local research experiments in Spiral 5:   [[BR]]
     96 Repeat throughput and range, comparing NEC and Airspan [[BR]]
     97
     98c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     99 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     100 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     101 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     102 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     103 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     104 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     105 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     106
     107d)  Support for unified GENI operations:  [[BR]]
     108 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     109 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     110 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     111
     112e)  Support for experiments:  [[BR]]
     113 Local research experiments [[BR]]
     114 Experiments by remote experimenters, including those at tutorials  [[BR]]
     115 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     116 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     117
     118
     119=== 4.4) NYU Poly Site Update ===
     120
     121Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
     122
     123GEC14 status:  [[BR]]
     124 * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
     125
     126 * Operational OMF/OML installation[[BR]]
     127 * Connected to I2 backbone network[[BR]]
     128 * Testbed open to experimenters since GEC12[[BR]]
     129
     130GEC15 status:  [[BR]]
     131
     132 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
     133
     134 * Airspan base station isntallation still pending.
     135 * Working closely with UMass Amherst on use of GIMI tools with WiMAX
     136 * Supporting experimenters, including students and tutorials
     137
     138a)  Status of deployments planned for Spiral 4:  [[BR]]
     139 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     140 Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
     141 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
     142 Add OMF/OML structures, including LoginService  (yes)  [[BR]]
     143 Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
     144 WiFi access point for dual-homing operating on custom PC node  (yes) [[BR]]
     145 Vehicular mobile station operating on custom PC node  (?)  [[BR]]
     146 Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
     147
     148b)  Plan for local research experiments in Spiral 5:   [[BR]]
     149 Many experiments formulated for students, and tutorials, including: [[BR]]
     150  StreamLoad [[BR]]
     151  NetCheck [[BR]]
     152  AFFIX [[BR]]
     153 Working on set of lab experiments to teach wireless principals  [[BR]]
     154
     155c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     156 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     157 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     158 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     159 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     160 Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     161 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     162
     163d)  Support for unified GENI operations:  [[BR]]
     164 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     165 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     166 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     167
     168e)  Support for experiments:  [[BR]]
     169 Local research experiments [[BR]]
     170 Experiments by remote experimenters, including those at tutorials  [[BR]]
     171 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     172 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     173
     174What are next steps?   [[BR]]
     175 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
     176
     177
     178
     179=== 4.5) UMass Amherst Site Update ===
     180
     181Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
     182
     183GEC14 status:
     184 * Add OMF/OML:  have installed  [[BR]]
     185 * Connect to I2 backbone network:  plan to do soon  [[BR]]
     186
     187 * Planned experiments:  use to integrate GIMI tools [[BR]]
     188
     189GEC15 status:  BR]]
     190 No report  [[BR]]
     191
     192
     193=== 4.6) Columbia University Site Update ===
     194Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
     195
     196
     197GEC15 status:  BR]]
     198 * No report  [[BR]]
     199
     200
     201=== 4.7) Univ of Colorado at Boulder Site Update ===
     202Dirk Grunwald (Colorado)  [[BR]]
     203
     204
     205GEC15 status:  BR]]
     206 * No report  [[BR]]
     207
     208
     209
     210
     211=== 4.8)  University of Wisconsin Site Extension Plan ===
     212
     213Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
     214
     215GEC14 status:  [[BR]]
     216 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]]
     217
     218 * Extension plan  [[BR]]
     219  * Add Airspan to building/tower near Capitol.  [[BR]]
     220  * Connect via Madison unified fiber project  [[BR]]
     221  * Outside contributions for power and poles.  [[BR]]
     222  * x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     223
     224
     225GEC15 status:  [[BR]]
     226 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
     227
     228
     229 * Airspan status [[BR]]
     230  * Planned installation blocked by site issues [[BR]]
     231  * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]]
     232
     233a)  Status of deployments planned for Spiral 4:  [[BR]]
     234 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     235 Install Airspan base station(s), with local NetSpan management system  (no;  restarting) [[BR]]
     236 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
     237 Add OMF/OML structures, including LoginService  (partial) [[BR]]
     238 Connect via switch to I2 backbone, via OF switches if there (?) [[BR]]
     239 WiFi access point for dual-homing operating on custom PC node  (no)  [[BR]]
     240 Vehicular mobile station operating on custom PC node  (no)  [[BR]]
     241 Fixed “mobile station” for remote experimenters operating on custom PC node  (no) [[BR]]
     242
     243b)  Plan for local research experiments in Spiral 5:   [[BR]]
     244 Focus on mobility experiments from bus  [[BR]]
     245 Planning multi-site video experiment with NYU Poly  [[BR]]
     246 Begin classroom use in Spring 2013  [[BR]]
     247
     248c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     249 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     250 Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     251 Connection to I2  (coordinated by BBN) [[BR]]
     252 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     253 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     254 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     255 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     256 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB) (or use local service?) [[BR]]
     257 Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     258 Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     259 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     260
     261d)  Support for unified GENI operations:  [[BR]]
     262 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     263 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     264 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     265
     266e)  Support for experiments:  [[BR]]
     267 Local research experiments [[BR]]
     268 Experiments by remote experimenters, including those at tutorials  [[BR]]
     269 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     270 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     271
     272What are next steps?   [[BR]]
     273 * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
     274 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
     275 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
     276
     277
     278=== 4.9)  UCLA Site Extension Plans ===
     279
    126280Giovanni Pau, Mario Gerla (UCLA) [[BR]]
    127281
     
    193347
    194348
    195 === 3.4)  Clemson University Site Deployment Plan ===
    196 3:30pm  [[BR]]
     349=== 4.10)  Clemson University Site Deployment Plan ===
     350
    197351K-C Wang, Reece Johnson (Clemson)
    198352
     
    263417 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    264418 
    265 === 3.5)  University of Wisconsin Site Extension Plan ===
    266 3:35pm  [[BR]]
    267 Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
    268 
    269 GEC14 status:  [[BR]]
    270  * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]]
    271 
    272  * Extension plan  [[BR]]
    273   * Add Airspan to building/tower near Capitol.  [[BR]]
    274   * Connect via Madison unified fiber project  [[BR]]
    275   * Outside contributions for power and poles.  [[BR]]
    276   * x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    277 
    278 
    279 GEC15 status:  [[BR]]
    280  * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
    281 
    282 
    283  * Airspan status [[BR]]
    284   * Planned installation blocked by site issues [[BR]]
    285   * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]]
    286 
    287 a)  Status of deployments planned for Spiral 4:  [[BR]]
    288  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
    289  Install Airspan base station(s), with local NetSpan management system  (no;  restarting) [[BR]]
    290  Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
    291  Add OMF/OML structures, including LoginService  (partial) [[BR]]
    292  Connect via switch to I2 backbone, via OF switches if there (?) [[BR]]
    293  WiFi access point for dual-homing operating on custom PC node  (no)  [[BR]]
    294  Vehicular mobile station operating on custom PC node  (no)  [[BR]]
    295  Fixed “mobile station” for remote experimenters operating on custom PC node  (no) [[BR]]
    296 
    297 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    298  Focus on mobility experiments from bus  [[BR]]
    299  Planning multi-site video experiment with NYU Poly  [[BR]]
    300  Begin classroom use in Spring 2013  [[BR]]
    301 
    302 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    303  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    304  Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    305  Connection to I2  (coordinated by BBN) [[BR]]
    306  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    307  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    308  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    309  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    310  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB) (or use local service?) [[BR]]
    311  Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    312  Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    313  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    314 
    315 d)  Support for unified GENI operations:  [[BR]]
    316  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    317  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    318  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    319 
    320 e)  Support for experiments:  [[BR]]
    321  Local research experiments [[BR]]
    322  Experiments by remote experimenters, including those at tutorials  [[BR]]
    323  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    324  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    325 
    326 What are next steps?   [[BR]]
    327  * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    328  * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    329  * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    330 
    331 === 3.6)  University of Michigan Site Deployment Plan ===
    332 3:40pm [[BR]]
    333 Morley Mao  (Michigan)  [[BR]]
    334 
    335 GEC13 plans:
    336  * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides]  [[BR]]
    337 
    338 GEC14 status:  [[BR]]
    339  * Extension plan  [[BR]]
    340   * Add one Airspan on top of building  [[BR]]
    341   * Will signals penetrate into buildings?  [[BR]]
    342   * One frequency from Clearwire  [[BR]]
    343   * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
    344   * Location and backhaul [[BR]]
    345   * Mobility and handover [[BR]]
    346 
    347 GEC15 status:[[BR]]
    348  * Base station installed, local Netspan ready, but waiting for power  [[BR]]
    349  * I2 connection pending  [[BR]]
    350 
    351 a)  Status of deployments planned for Spiral 4:  [[BR]]
    352  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes) [[BR]]
    353  Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
    354  Add OMF/OML structures, including LoginService  (no) [[BR]]
    355  Connect via switch to I2 backbone, via OF switches if there   (pending) [[BR]]
    356  WiFi access point for dual-homing operating on custom PC node (no) [[BR]]
    357  Fixed “mobile station” for remote experimenters operating on custom PC node (no)  [[BR]]
    358 
    359 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    360  Content delivery service [[BR]]
    361 
    362 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    363  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    364  Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    365  Connection to I2  (coordinated by BBN) [[BR]]
    366  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    367  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    368  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    369  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    370  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    371  Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    372  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    373 
    374 d)  Support for unified GENI operations:  [[BR]]
    375  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    376  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    377  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    378 
    379 e)  Support for experiments:  [[BR]]
    380  Local research experiments [[BR]]
    381  Experiments by remote experimenters, including those at tutorials  [[BR]]
    382  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    383  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    384 
    385 What are next steps?   [[BR]]
    386  * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    387  * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    388  * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
    389 
    390 
    391 === 3.7)  Wayne State University Site Deployment Plan ===
    392 3:45m   [[BR]]
     419
     420=== 4.11)  Wayne State University Site Deployment Plan ===
     421
    393422Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    394423
     
    461490
    462491
    463 === 3.8) NYU Poly Site Update ===
    464 3:50pm   [[BR]]
    465 Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
    466 
    467 GEC14 status:  [[BR]]
    468  * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
    469 
    470  * Operational OMF/OML installation[[BR]]
    471  * Connected to I2 backbone network[[BR]]
    472  * Testbed open to experimenters since GEC12[[BR]]
    473 
    474 GEC15 status:  [[BR]]
    475 
    476  * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
    477 
    478  * Airspan base station isntallation still pending.
    479  * Working closely with UMass Amherst on use of GIMI tools with WiMAX
    480  * Supporting experimenters, including students and tutorials
    481 
    482 a)  Status of deployments planned for Spiral 4:  [[BR]]
    483  Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     492=== 4.12)  University of Michigan Site Deployment Plan ===
     493
     494Morley Mao  (Michigan)  [[BR]]
     495
     496GEC13 plans:
     497 * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides]  [[BR]]
     498
     499GEC14 status:  [[BR]]
     500 * Extension plan  [[BR]]
     501  * Add one Airspan on top of building  [[BR]]
     502  * Will signals penetrate into buildings?  [[BR]]
     503  * One frequency from Clearwire  [[BR]]
     504  * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
     505  * Location and backhaul [[BR]]
     506  * Mobility and handover [[BR]]
     507
     508GEC15 status:[[BR]]
     509 * Base station installed, local Netspan ready, but waiting for power  [[BR]]
     510 * I2 connection pending  [[BR]]
     511
     512a)  Status of deployments planned for Spiral 4:  [[BR]]
     513 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes) [[BR]]
    484514 Install Airspan base station(s), with local NetSpan management system  (pending) [[BR]]
    485  Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
    486  Add OMF/OML structures, including LoginService  (yes)  [[BR]]
    487  Connect via switch to I2 backbone, via OF switches if there  (yes) [[BR]]
    488  WiFi access point for dual-homing operating on custom PC node  (yes) [[BR]]
    489  Vehicular mobile station operating on custom PC node  (?)  [[BR]]
    490  Fixed “mobile station” for remote experimenters operating on custom PC node (yes)  [[BR]]
    491 
    492 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    493  Many experiments formulated for students, and tutorials, including: [[BR]]
    494   StreamLoad [[BR]]
    495   NetCheck [[BR]]
    496   AFFIX [[BR]]
    497  Working on set of lab experiments to teach wireless principals  [[BR]]
    498 
    499 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    500  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    501  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    502  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    503  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    504  Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     515 Add OMF/OML structures, including LoginService  (no) [[BR]]
     516 Connect via switch to I2 backbone, via OF switches if there   (pending) [[BR]]
     517 WiFi access point for dual-homing operating on custom PC node (no) [[BR]]
     518 Fixed “mobile station” for remote experimenters operating on custom PC node (no)  [[BR]]
     519
     520b)  Plan for local research experiments in Spiral 5:   [[BR]]
     521 Content delivery service [[BR]]
     522
     523c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     524 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     525 Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     526 Connection to I2  (coordinated by BBN) [[BR]]
     527 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     528 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     529 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     530 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     531 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     532 Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    505533 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    506534
     
    517545
    518546What are next steps?   [[BR]]
     547 * Establish a plan for all of your Spiral 5 tasks, and document  (due 12/1/12)  [[BR]]
    519548 * Complete installation of Airspan base station, use early release of WiMAX RF AggMgr with local OMF/OML to configure, check over-the-air throughput  (due 12/15/12) [[BR]]
    520 
    521 
    522 === 3.9) UMass Amherst Site Update ===
    523 3:55pm   [[BR]]
    524 Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
    525 
    526 GEC14 status:
    527  * Add OMF/OML:  have installed  [[BR]]
    528  * Connect to I2 backbone network:  plan to do soon  [[BR]]
    529 
    530  * Planned experiments:  use to integrate GIMI tools [[BR]]
    531 
    532 GEC15 status:  BR]]
    533  No report  [[BR]]
    534 
    535 === 3.xx)  Temple University Site Deployment Plan ===
     549 * Complete connection to I2 backbone, and demonstrate a service with another site(s)  (due 1/15/12)  [[BR]]
     550
     551
     552
     553
     554
     555
     556
     557
     558=== 4.13)  Temple University Site Deployment Plan ===
    536559Shan Lin, Jie Wu (Temple)  [[BR]]
    537560
     
    565588 * No report  [[BR]]
    566589 
    567 === 3.xx)  Drexel University Site Deployment Plan ===
     590=== 4.14)  Drexel University Site Deployment Plan ===
    568591Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
    569592
     
    589612GEC15 status:  BR]]
    590613 * No report  [[BR]]
    591 
    592 
    593 
    594 === 3.xx) Univ of Colorado at Boulder Site Update ===
    595 Dirk Grunwald (Colorado)  [[BR]]
    596 
    597 
    598 GEC15 status:  BR]]
    599  * No report  [[BR]]
    600 
    601 === 3.xx) Columbia University Site Update ===
    602 Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
    603 
    604 
    605 GEC15 status:  BR]]
    606  * No report  [[BR]]
    607