Changes between Version 90 and Version 91 of WiMAXInteg/CampusInstallation


Ignore:
Timestamp:
05/07/10 17:56:46 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXInteg/CampusInstallation

    v90 v91  
    348348Henning on 2/8:  Starting application process with IT.  Likely site to be on engineering building, near amateur radio station.  [[BR]]
    349349Ivan on 3/1:  Application completed.  [[BR]]
    350 ISSUE:  Verify current status with Henning, antenna 360 or 120 degree? [[BR]]
    351 ISSUE:  Harry on 3/30:  Concern about Clearwire rollout in NYC;  see below. [[BR]]
    352 NOTE:  Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service.  [[BR]]
    353 
    354 Yes, I applied a few weeks ago (Feb. 26, to be precise), but haven't heard back anything beyond that my credit card got charged
    355 
    356 > Also, we've been looking at Clearwire's deployment plans, and they
    357 > indicate a rollout in NYC during 2010.  That could affect you (and Poly), unless you find spectrum they do not lease.  Do you have any info?
    358 
    359 No, unfortunately not. I'd imagine the FCC would tell us if there was a pending license. (There was none in the FCC database that I could find.)
    360 
    361 Henning on ?:  Has received license;  working with IT on site.  [[BR]]
     350Henning on 3/10:  Yes, I applied a few weeks ago (Feb. 26, to be precise), but haven't heard back anything beyond that my credit card got charged [[BR]]
     351Henning on 4/15:  Has received license;  working with IT on site.  [[BR]]
     352Henning on 4/30:  Waiting for IT to schedule site visit, 14th floor Mudd Bldg, tallest on campus, near amateur radio shack.  [[BR]]
     353120 degree antenna OK, pointed towards campus  [[BR]]
     354Columbia needs to order:  coax for GPS antenna;  power cable and/or weatherproof box [[BR]]
     355BBN needs to check:  will power supply fit in small weatherproof box   Answer:  No[[BR]]
     356Later, Rutgers will ship:  fiber;  ODU and power supply;  antenna, 120 degree;  GPS antenna;  IDU and power supply;  server with partial software (need release from Japan) [[BR]]
     357Recommend Columbia  apply for 5MHz experimental license now. [[BR]]
     358Consider:  Having Columbia apply for permanent Educational license, 5MHz.  See http://groups.geni.net/geni/wiki/WiMAXInteg#a5.4GENIWiMAXLicenses   [[BR]]
    362359
    363360
     
    369366Antenna 360 degree [[BR]]
    370367ISSUE:  Harry on 3/30:  Concern about Clearwire rollout in NYC;  see below. [[BR]]
    371 NOTE:  Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service.  [[BR]]
    372368Thanasis on 4/20:  Has received license.  Will file for 2nd license in gap. [[BR]]
     369Thanasis on 4/30:  Easy access to the roof;  has pipe in place on roof.[[BR]]
     370Rutgers will ship on 5/3:  fiber;  ODU;  antenna, 120 degree (towards campus);  ODU power supply[[BR]]
     371NYU Poly needs to order:  coax for GPS antenna;  power cable and/or weatherproof box[[BR]]
     372BBN needs to check:  will power supply fit in small weatherproof box  Answer:  No[[BR]]
     373Later, Rutgers will ship:  GPS antenna;  IDU and power supply;  server with partial software (need release from Japan)[[BR]]
     374Recommend NYU Poly apply for 5MHz experimental license now.[[BR]]
     375Consider:  Having NYU Poly apply for permanent Educational license, 5MHz  See http://groups.geni.net/geni/wiki/WiMAXInteg#a5.4GENIWiMAXLicenses  [[BR]]
     376
    373377       
    374378UCLA (1797)     PI: Mario Gerla, Giovanni Pau [[BR]]
     
    384388Suman on 3/16:  Have agreement to purchase a 2nd kit from NEC.  With this, will have three base stations, enough to cover the campus. [[BR]]
    385389Antenna, 120 degree [[BR]]
     390Suman on 5/5:  Have received 2nd experimental license.  [[BR]]
    386391
    387392UMass Amherst (1731)    PI:  Mark Corner, Brian Lynn [[BR]]
     
    404409Expect Univ Colorado to lease  34MHz A1-3,B1-3 blocks to Clearwire near campus, and beyond. [[BR]]
    405410Negotiating with Univ Colorado for 12MHz A4/B4 blocks near campus, but expect them to be leased to Clearwire beyond campus. [[BR]]
    406 Applying for experimental license in C&D bands today [[BR]]
     411Applying for experimental license in C&D bands today   Received 4/19[[BR]]
    407412Working with campus IT on getting VLANs to Internet2 [[BR]]
    408413Turnup in early June, 2010 is possible. [[BR]]