Changes between Version 8 and Version 9 of WiMAXInteg/CampusInstallation


Ignore:
Timestamp:
11/25/09 17:48:52 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXInteg/CampusInstallation

    v8 v9  
    77=== 7.1  License ===
    88
    9 Person submitting application needs to obtain either personal or institution FCC Registration Number (FRN); if one is not available, it can be obtained through  [https://fjallfoss.fcc.gov/coresWeb/publicHome.do FCC's COmmission REgistration System (CORES) registration]. With FRN, applicant can start the application process by filling [https://fjallfoss.fcc.gov/oetcf/els/forms/442Entry.cfm Form 442]. Required information for filling up the form includes:
     9Person submitting application needs to obtain either personal or institution FCC Registration Number (FRN); if one is not available, it can be obtained through  [https://fjallfoss.fcc.gov/coresWeb/publicHome.do FCC's COmmission REgistration System (CORES) registration].
    1010
    11  * Frequency:
     11With FRN, applicant can start the application process by filling [https://fjallfoss.fcc.gov/oetcf/els/forms/442Entry.cfm Form 442]. Required information for filling up the form includes:
     12
     13 * Frequency: [??]
    1214 * Frequency tolerance: 0.00002 %
    1315 * Power: 20 W
    1416 * Radius: 5 km
    15  * Location: please use Google Earth/Maps to find out latitude/longitude of the location where you plan to install the antenna
     17 * Location: [please use Google Earth/Maps to find out latitude/longitude of the location where you plan to install the antenna]
    1618 * Emission designator: W7D
    1719 * Contracting Agency: National Science Foundation
    18  * Contract Number: XXX
     20 * Contract Number: 0944089
    1921
    20 It should be noted that this license (experimental authorization) "is to be used for fulfilling the requirements of a U.S. government contract" and each application should attach [] and [] in the filing process since this increase the likelihood of license issuance and will expedite the process. At the end of the application process, the applicant must [https://fjallfoss.fcc.gov/FeeFiler/login.cfm pay the $60 application fee]; the fastest method of payment is by credit card. NOTE: FCC has a site for [https://selafoss.fcc.gov/oetcf/els/index.cfm testing the application process].
     22It should be noted that this license (experimental authorization) "is to be used for fulfilling the requirements of a U.S. government contract".
    2123
    22 Once application process is completed and assuming there are no issues with the particular location, after 4-8 weeks FCC will issue [attachment:Winlab-WiMax-License.pdf WiMAX license].
     24Each application should attach [] and [] in the filing process since this increase the likelihood of license issuance and will expedite the process.
     25
     26At the end of the application process, the applicant must [https://fjallfoss.fcc.gov/FeeFiler/login.cfm pay the $60 application fee]; the fastest method of payment is by credit card. NOTE: FCC has a site for [https://selafoss.fcc.gov/oetcf/els/index.cfm testing the application process].
     27
     28Once application process is completed and assuming there are no issues with the particular location, after 4-8 weeks FCC will issue WIMAX license.
     29
     30Here is  [attachment:Winlab-WiMax-License.pdf Rutgers WiMAX license].
    2331
    2432