v20 v21 69 69 * Access to Indoor Equipment Room, for power and fiber (signal) cables. The use of a conduit is preferred, but otherwise the fiber (signal) cables must be mechanically protected. 70 70 71 * Secure access, to prevent unauthorized people from disrupting installation, or receivingelectromagnetic exposure.71 * Secure access, to prevent unauthorized people from disrupting operation, or receiving unhealthy electromagnetic exposure. 72 72 73 73 NOTE: It is suggested that this process be started IMMEDIATELY, to assure that an appropriate outdoor site can be identifed. … … 92 92 * Access to backbone network Layer 2 connection. 93 93 94 * Secure access, to prevent unauthorized people from disrupting installation, or receiving electromagnetic exposure.94 * Secure access, to prevent unauthorized people from disrupting operation. 95 95 96 96 NOTE: It is suggested that this process be started IMMEDIATELY, to assure that an appropriate indoor equipment room can be identifed. … … 98 98 99 99 100 === 7.4 Install Wiring Between Outdoor Site and Indoor Equipment Room === 100 === 7.4 Install Wiring at Outdoor Site and to Indoor Equipment Room === 101 102 The following cables must be run at the Outdoor Site and between the Outdoor Site and the Indoor Equipment Room: 103 104 105 * Heavy ground cable, from pole to building ground, for lightning protection. 106 107 ISSUE: Does this require a PE? 108 109 * Two coaxial cables between (one) Outdoor Unit and (one) Antenna, including lightning protector. See ? 110 111 ISSUE: Does kit contain these cables? 112 113 * One -48VDC power cable, from (one) Outdoor Unit to indoor equipment room. See ? 114 115 ISSUE: Does kit contain this cable? 116 117 * Two fiber signal cables, from (one) Outdoor Unit to indoor equipment room. See ? 118 119 ISSUE: Does kit contain these cables? 101 120 102 121 … … 120 139 The installation should be performed by qualified PE to ensure proper grounding and should follow [attachment:BS_INSTALLATION.pdf NEC's installation instructions] 121 140 122 === 7.8 Complete Wiring of Base Station Outdoor Unit === 141 === 7.8 Complete Wiring Between Outdoor Site and Indoor Equipment Room === 142 143 123 144 124 145 === 7.9 Install Indoor Equipment Racks and Ground ===