Changes between Version 16 and Version 17 of WiMAXInteg/CampusInstallation
- Timestamp:
- 11/30/09 14:11:18 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WiMAXInteg/CampusInstallation
v16 v17 5 5 6 6 7 === 7.1 License ===7 === 7.1 Obtain FCC License === 8 8 9 9 Each campus must apply to the FCC and obtain a license (experimental authorization) to operate the WiMAX equipment at their location. … … 32 32 Here is a sample license, the [attachment:Winlab-WiMax-License.pdf WINLAB Rutgers WiMAX license] received from the FCC. 33 33 34 === 7.2 Identify Outdoor Site on Campus === 34 35 35 === 7.2 Antenna === 36 37 === 7.3 Identify Indoor Equipment Room on Campus === 38 39 40 === 7.4 Install Wiring Between Outdoor Site and Indoor Equipment Room === 41 42 43 === 7.5 Install Pole at Outdoor Site and Ground === 44 45 46 === 7.6 Install Antenna at Outdoor Site === 36 47 37 48 [[Image(Antenna.jpg, height=160px, align=right)]] … … 42 53 The installation should be performed by qualified PE to ensure proper grounding and should follow [attachment:ANTENNA.pdf NEC's mounting instructions]. 43 54 44 === 7.3 Base Station Outdoor and Indoor Units === 55 56 === 7.7 Install Base Station Outdoor Unit === 45 57 46 58 The Outdoor Unit (ODU) is mounted outdoors, near the antenna. It connects to the antenna with a coaxial cable, and connects to the Indoor Unit (IDU) with two fibers. In addition, it requires a -48 power feed and a protection ground. 59 60 The installation should be performed by qualified PE to ensure proper grounding and should follow [attachment:BS_INSTALLATION.pdf NEC's installation instructions] 61 62 === 7.8 Complete Wiring of Base Station Outdoor Unit === 63 64 === 7.9 Install Indoor Equipment Racks and Ground === 65 66 === 7.10 Install 120VAC and -48VDC Power Feeds and/or Supplies === 67 68 === 7.11 Install Base Station Indoor Unit === 47 69 48 70 The Indoor Unit (IDU) is mounted indoors, typically in an equipment room. It connects to the ODU with two fibers, and to the Linux servers usxing an ethernet cable. In addition, it requires a -48 power feed and a protection ground. … … 51 73 The installation should be performed by qualified PE to ensure proper grounding and should follow [attachment:BS_INSTALLATION.pdf NEC's installation instructions] 52 74 53 === 7.4 Linux Server(s) and Software === 75 === 7.12 Complete Wiring of Base Station Indoor Unit === 76 77 === 7.13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units === 78 79 80 81 === 7.14 Install Linux Server(s) and Software === 54 82 55 83 56 === 7. 5 Backbone Network Connectivity===84 === 7.15 Connect Backbone Network === 57 85 58 86 59 === 7. 6Reference Client Platform ===87 === 7.16 Provide Reference Client Platform === 60 88 61 89 62 === 7. 7 Inital Check-Out===90 === 7.17 Inital Check-Out of Campus WiMAX Testbed ===