108 | | Brainstorming and discussion by group at GEC7 meeting on March 16:[[BR]] |
109 | | 1) Multi-campus application, e.g, wideband video between handsets; distributed conferencing; video content distribution[[BR]] |
110 | | 2) Mobile connectivity: car to car, car to infrastructure via WiMAX[[BR]] |
111 | | 3) Portable switch for Layer 2 connectivity; like Sprint mobile hot spot, except Layer 2; client to switch via WiFi, switch to infrastructure via WiMAX; good for campus access.[[BR]] |
112 | | 4) Virtualized WiMAX provides emergency slice; adjust network utilization to assure good QoS for emergency slice; reassign to accomplish dynamic provisioning.[[BR]] |
| 96 | ==== "Wirel" Demo at GEC9 ==== |
114 | | Stretch deployment goal discussed by Ivan, Harry and Tony on March 22: [[BR]] |
115 | | 1) Rutgers would ship three kits by mid-May to campuses. [[BR]] |
116 | | 2) Rutgers (with possible help from BBN) would get four campuses (e.g., Rutgers, BBN, UMass, and ?) setup with outdoor WiMAX systems by June 15. [[BR]] |
117 | | 3) Basic multi campus demo could be done by GEC8 [[BR]] |
118 | | 4) Extended multi campus demo could be done by GEC9 [[BR]] |
| 98 | This demo combines both WiMAX and OpenFlow elements. [[BR]] |
120 | | Submitted to Mark Berman on March 31: [[BR]] |
121 | | 1) Rutgers and Stanford have proposed a "Wirel" demo proposal for GEC9, that combines both WiMAX and OpenFlow elements. [[BR]] |
122 | | |
123 | | Demo plans for GEC8 and/or GEC9 discussed by Ray, Ivan, Harry, Mark and Tony on April 13: [[BR]] |
124 | | 1) Wirel demo is separate, only Rutgers and Stanford. [[BR]] |
125 | | 2) Goals for GEC8 demo: [[BR]] |
126 | | * WiMAX base station infrastructure is in place on multiple campuses (four?), and operational. [[BR]] |
127 | | * WiMAX base station is virtualized, with multiple slices, including (if possible) one multi-site slice. [[BR]] |
128 | | * A slice can be configured by an experimenter, including (if possible) downloading code into the slice's VM in the gateway. [[BR]] |
129 | | 3) Goals for GEC9 demo: [[BR]] |
130 | | * Full WiMAX capabilities. [[BR]] |
131 | | * Openness of the API. [[BR]] |
132 | | * Multicasting across the country, through multiple sites. [[BR]] |
133 | | * Rate adaptation to available bandwidth. [[BR]] |
134 | | * Meet the objective for a research experiment.[[BR]] |
135 | | 4) Specific demo ideas:[[BR]] |
136 | | * Basic video multicast.[[BR]] |
137 | | * Extended video multicast, with rate adapted to available bandwidth (under study now, not easy). |
138 | | * Multicast of test UDP packets, where measure available downstream rates at multiple sites, via multiple connectivity situations, and report back to measurement archive; might be extended to include available upstream rates; could eventually be used to automatically evaluate a network deployment.[[BR]] |
139 | | * Cache and forward, to provide a delay-tolerant network.[[BR]] |
140 | | * Use Layer 2 connectivity, but how?[[BR]] |
141 | | |
142 | | |
143 | | === 11.5 Experiment Issues === |
144 | | |
145 | | |
146 | | || No || Issue || Who || Opened || Resolved || Resolution || Note || |
147 | | || 11.1 || Establish experiment demo plan: Who will be responsible for each experiment/demo? Can we plan a completion date? || Mussman, Seskar, team, Berman || - || - || - || - || |
148 | | || 11.2 || Need to plan tutorial at Rutgers this summer, before GEC8, on getting started with WiMAX || Bhanage || 3/16/10 || - || - || - || |
149 | | || 11.3 || - || - || - || - || - || - || |
150 | | || 11.4 || - || - || - || - || - || - || |
151 | | || 11.5 || - || - || - || - || - || - || |
| 100 | |