Changes between Version 85 and Version 86 of ViSE


Ignore:
Timestamp:
03/12/10 23:15:32 (14 years ago)
Author:
jwilliams@bbn.com
Comment:

updated spiral 1 milestone links to point to renamed milestones using S1.<X> scheme.

Legend:

Unmodified
Added
Removed
Modified
  • ViSE

    v85 v86  
    137137=== Milestones ===
    138138
    139 [[MilestoneDate(ViSE: 1a Assembly of three x86 sensor nodes)]]
     139[[MilestoneDate(ViSE: S1.a Assembly of three x86 sensor nodes)]]
    140140[http://groups.geni.net/geni/ticket/18  status]
    141141[[BR]]
    142 [[MilestoneDate(ViSE: 1b Field deployment of three sensor nodes)]]
     142[[MilestoneDate(ViSE: S1.b Field deployment of three sensor nodes)]]
    143143[http://groups.geni.net/geni/ticket/20  status]
    144144[[BR]]
    145 [[MilestoneDate(ViSE: 1c Initial Shirako/ORCA integration-)]]
     145[[MilestoneDate(ViSE: S1.c Initial Shirako/ORCA integration-)]]
    146146[http://groups.geni.net/geni/ticket/39  status]
    147147[[BR]]
    148 [[MilestoneDate(ViSE: 1d Operational web portal and testbed; Application demo)]]
     148[[MilestoneDate(ViSE: S1.d Operational web portal and testbed; Application demo)]]
    149149[http://groups.geni.net/geni/ticket/104  status]
    150150[[BR]]
    151 [[MilestoneDate(ViSE: 1c2 Complete initial Shirako/ORCA integration-)]]
     151[[MilestoneDate(ViSE: S1.c2 Complete initial Shirako/ORCA integration-)]]
    152152[http://groups.geni.net/geni/ticket/40  status]
    153153[[BR]]
    154 [[MilestoneDate(ViSE: 1e Contingent upon availability of reference implementation of Shirako/ORCA at 6 months, import and then integrate)]]
     154[[MilestoneDate(ViSE: S1.e Contingent upon availability of reference implementation of Shirako/ORCA at 6 months, import and then integrate)]]
    155155[http://groups.geni.net/geni/ticket/105  status]
    156156[[BR]]
    157 [[MilestoneDate(ViSE: 1f Complete Xen sensor virtualization)]]
     157[[MilestoneDate(ViSE: S1.f Complete Xen sensor virtualization)]]
    158158[http://groups.geni.net/geni/ticket/106  status]
    159159[[BR]]
    160 [[MilestoneDate(ViSE: 1g Contingent upon available budget, provide a VLAN connection from your testbed to the Internet2)]]
     160[[MilestoneDate(ViSE: S1.g Contingent upon available budget, provide a VLAN connection from your testbed to the Internet2)]]
    161161[http://groups.geni.net/geni/ticket/147  status]
    162162[[BR]]
    163 [[MilestoneDate(ViSE: 1h Virtualization of actuators; single guest VM; demo)]]
     163[[MilestoneDate(ViSE: S1.h Virtualization of actuators; single guest VM; demo)]]
    164164[http://groups.geni.net/geni/ticket/148  status]
    165165[[BR]]
    166 [[MilestoneDate(ViSE: 1i Testbed available for public use within our cluster)]]
     166[[MilestoneDate(ViSE: S1.i Testbed available for public use within our cluster)]]
    167167[http://groups.geni.net/geni/ticket/149  status]
    168168[[BR]]
    169 ViSE:  1out  Outreach activites for year 1
     169ViSE:  1out  Outreach activities for year 1
    170170[http://groups.geni.net/geni/ticket/152  status]
    171171[[BR]]
     
    2382388)  Also, once IP addressing is clarified for this VLAN, we’ll need to configure some OIT network equipment to allow the selected address range(s) to pass through. [[BR]]
    239239
    240 We intend this VLAN connection to service both the ViSE and the DOME testbeds.  Note that Layer 2 ethernets will not extend to the DieselNet nodes, due to limitations in the existing deployed systems, but IP tunnels to the layer 2 VLAN termination points should be feasible for connecting mobile endpoints to the GENI virtual ethernets.[[BR]]
     240We intend this VLAN connection to service both the ViSE and the DOME testbeds.  Note that Layer 2 ethernets will not extend to the !DieselNet nodes, due to limitations in the existing deployed systems, but IP tunnels to the layer 2 VLAN termination points should be feasible for connecting mobile endpoints to the GENI virtual ethernets.[[BR]]
    241241
    242242In the coming year, we have committed to planning with our peers in Cluster D and the GPO on how to best use this new capability. As part of this plan, and before we can send/receive traffic on this link, we will discuss the roles and capabilities of Internet2 in forwarding our traffic to its correct destination. [[BR]]