Changes between Version 9 and Version 10 of Tutorials/ICDCS2013/GettingStartedWithGENI_I/Procedure/DesignSetup
- Timestamp:
- 07/05/13 10:58:47 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Tutorials/ICDCS2013/GettingStartedWithGENI_I/Procedure/DesignSetup
v9 v10 320 320 <li>Repeat the above three steps using the other aggregate listed on your worksheet. Label the second VM "server".</li> 321 321 <li>You should now see two VM boxes on the canvas.</li> 322 </ol> 323 </td> 324 <td> 325 326 <img border="0" src="http://groups.geni.net/geni/attachment/wiki/GEC17Agenda/GettingStartedWithGENI_I/Graphics/twovm_v1.png?format=raw" alt="Two VMs" height="250" title="Two VMs" /> 327 <br /> 328 <b>Figure 3-7</b> <i>Two VMs.</i> 329 </td> 330 </tr> 331 <tr> 332 333 <td > 334 <ol start='10'> 335 322 336 <li>Now click near one of the VM boxes on the canvas, then click and drag towards the other VM. Release when you reach the other VM. You should now see a line and a box representing a link (labeled "gre-tunnel1") connecting the two VMs.</li> 323 337 <li>To edit this link, click the <b>i</b> in the circle.</li>