Experimenter Requirements
GENI experimenters provide major input to the meso-scale experiments requirements that drive this project. Following is a list of requirements as understood at this time.
The following requirements MUST be met within the Plastic Slices Project:
R001 - Include resources from multiple interoperating aggregates in a slice.
R002 - Allow experimenters to control end-to-end data planes supporting a slice.
R003 - Allow multiple experiment team members to share resources in a slice.
R004 - Operate experiments continuously for three or more months.
R005 - Operate many experiments simultaneously.
R006 - Support non-IP protocol experiments.
R007 - Support comparison of IP and non-IP path results within an experiment.
R008 - Support video and audio applications.
The following requirements MUST be met within the next meso-scale experiment project:
R009 - Support control and data connections from mobile endpoints.
R010 - Support use of cloud services with GENI slices.
R011 - Support up to 1000 hosts in an experiment.
R012 - Support BGPMux in an experiment.
R013 - Support experimenter-controlled load sharing.
R014 - Support bandwidth enforcement (QoS-like functions).
The following general operations requirements from campuses, operators, and experimenters MAY be met:
R015 - Ensure that GENI experiments are compatible with campus security policies.
R016 - Allow campuses to manage access to the resources they contribute to GENI.
R017 - Ensure that the level of effort required from campus IT staff to manage GENI experiments is reasonable, compared to similar research programs.
R018 - Make experiments easier to set up and take down than they were at GEC9.
R019 - Make experiments easier to change (add/delete resources, change data paths) than they were at GEC9.
R020 - Try out operations procedures and policies that can transition to production at-scale use.
Requirements Status
This section will track the status for each requirement listed above. Note the chart below captures 3 possible states for the requirement being met, they include (Y=Yes, N=No, and P=Partially met.)
Requirements that MUST be met for current project:
Req # | Type | Met | Known Issues |
R001 | MUST | Y | ticket#,# |
R002 | MUST | P | ticket#,# |
R003 | MUST | N | ticket#,# |
R004 | MUST | N | ticket#,# |
R005 | MUST | N | ticket#,# |
R006 | MUST | N | ticket#,# |
R007 | MUST | N | ticket#,# |
R008 | MUST | N | ticket#,# |
R008 | MUST | N | ticket#,# |
Requirements that MUST be met for next project:
Req # | Type | Met | Known Issues |
R009 | MUST | Y | ticket#,# |
R010 | MUST | P | ticket#,# |
R011 | MUST | N | ticket#,# |
R012 | MUST | N | ticket#,# |
R013 | MUST | N | ticket#,# |
R014 | MUST | N | ticket#,# |
Requirements that MAY for current project:
Req # | Type | Met | Known Issues |
R015 | MAY | N | ticket#,# |
R016 | MAY | N | ticket#,# |
R017 | MAY | N | ticket#,# |
R018 | MAY | N | ticket#,# |
R019 | MAY | N | ticket#,# |
R020 | MAY | N | ticket#,# |