Changes between Version 3 and Version 4 of ORCA-BEN-GEC13-SR
- Timestamp:
- 04/23/12 17:18:23 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ORCA-BEN-GEC13-SR
v3 v4 5 5 I. Major accomplishments 6 6 7 Created [https://geni-orca.renci.org/trac/wiki/releases/Camano-3.1-extended Camano-3.1-extended release] with more robust topology embedding, OpenFlow and better GENI AM API v2 compliance. In a separate branch of code tested a prototype libABAC integration with ORCA. Deployed 3.1-extended with the first two ExoGENI racks. 7 Created [https://geni-orca.renci.org/trac/wiki/releases/Camano-3.1-extended Camano-3.1-extended release] with more robust topology embedding, OpenFlow and better GENI AM API v2 compliance. In a separate branch of code tested a prototype libABAC integration with ORCA. Deployed 3.1-extended with the first two ExoGENI racks. Ran an experimenter tutorial at GEC13 on ExoGENI racks and existing Duke, RENCI, UNC and UH ORCA installations. 8 8 9 9 A. Milestones achieved 10 10 11 ORCAAUG: S4.a GEC12 Cluster D roadmap review (Due 11/04/11 (late)) 12 ORCAAUG: S4.b ORCA intermediate code release and documentation (Due 11/30/11 (late)) 13 ORCAAUG: S4.c GEC13 Cluster D roadmap review (Due 03/15/12 (late)) 14 ORCAAUG: S4.d ORCA Dungeness 4.0 code release and documentation (Due 03/31/12 (late)) 15 ORCAAUG: S4.e GEC14 Cluster D roadmap review (Due 07/31/12) 16 ORCAAUG: S4.f ORCA Dungeness 4.1 code release (Due 08/15/12) 11 The Camano-3.1-extended is an intermediate release with topology embedding, GENI AM API and other functions overlayed on top of an older 3.X ORCA code base. Development of a drastically re-factored ORCA 4.0 codebase is also ongoing, with features from 3.1-extended due to be ported to the 4.0 codebase before GEC14. These activities count towards partial fulfillment of ORCAAUG: S4.d ORCA Dungeness 4.0 code release and documentation milestone. 17 12 18 13 B. Deliverables made 14 15 ORCA Camano-3.1-extended code is available to other ORCA adopters. The code has been 19 16 20 17 II. Description of work performed during last quarter