    3333 * OpenFlow switch installation and cross-connects were completed
    34  * GEC 8 demo passing traffic between IU campus OpenFlow environment through a section of the NLR OpenFlow backbone and an NLR FrameNet-connected host in Seattle.
     34 * GEC 8 demo passing traffic through a section of the NLR OpenFlow backbone between the IU campus OpenFlow environment and an NLR FrameNet-connected host in Seattle.
    3535 * VLAN configuration planning
    3636   * VLANs specified for core network