Changes between Version 11 and Version 12 of IMInteroperability
- Timestamp:
- 04/23/13 10:34:53 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
IMInteroperability
v11 v12 2 2 3 3 = Interoperability of I&M Tools on GENI Racks = 4 5 6 == 1) Goals == 4 7 5 8 The primary goal of this effort is to get the GIMI and GEMINI tools working on both InstaGENI and ExoGENI racks. … … 22 25 * Utah emulab, UKY emulab, PGENI, GENI Portal 23 26 24 == Mailing lists == 27 == 2) Mailing lists == 28 25 29 These lists should be used for help on questions or issues with each of the racks. Subscribing to each of these lists will allow you to see the latest questions, answers, known issues and scheduled downtime related to each of the racks. 26 30 … … 28 32 * InstaGENI: progoteni-users@googlegroups.com 29 33 30 == Known differences between racks ==34 == 3) Known differences between racks == 31 35 || || '''ExoGENI''' || '''InstaGENI''' || 32 36 || '''Virtualization technology''' || KVM || openvz || … … 36 40 37 41 38 ----- 39 40 == GIMI on InstaGENI == 41 42 === Tools === 42 == 3) GIMI on InstaGENI == 43 44 === 3.1) Tools === 43 45 * Sliver creation 44 46 * Flack … … 48 50 * OMF/OML 49 51 50 === Resources ===52 === 3.2) Resources === 51 53 No known resource restrictions identified yet. 52 54 53 === Images ===55 === 3.3) Images === 54 56 * Create custom VM image 55 57 * Fedora 56 58 * common Ubuntu image not expected until July 57 59 58 === Rspecs ===60 === 3.4) Rspecs === 59 61 * Convert current tutorial RDF to rspec 60 62 * Should work if only nodes and links are specified … … 67 69 68 70 69 === Configuration ===71 === 3.5) Configuration === 70 72 * Convert postboot functionality into execute service script 71 73 72 === Certificates ===74 === 3.6) Certificates === 73 75 * Certificates not yet used for Labwiki 74 76 75 === Testing ===77 === 3.7) Testing === 76 78 77 79 ==== Browser Compatibility ==== … … 82 84 || '''Safari''' || || || N/A || 83 85 84 ----- 85 86 == GEMINI on ExoGENI ==87 88 === Tools ===86 87 88 == 4) GEMINI on ExoGENI == 89 90 === 4.1) Tools === 89 91 * Sliver creation 90 92 * Read https://wiki.exogeni.net/doku.php?id=public:experimenters:start … … 94 96 * GENI Desktop 95 97 96 === Resources ===98 === 4.2) Resources === 97 99 * Main concern is public IPs with access to certain ports for instrumentation 98 100 * Ilia confirms that all nodes have public IPs assigned. He will check if there are any port restrictions. 99 101 100 === Images ===102 === 4.3) Images === 101 103 * Create custom VM image 102 104 * Ezra and Hussam will determine the initial target OS 103 105 * Read https://geni-orca.renci.org/trac/wiki/neuca-images 104 106 105 === Rspecs ===107 === 4.4) Rspecs === 106 108 * How does ExoGENI handle GEMINI extensions? 107 109 * Outstanding issue: ORCA is not able to pass thru extensions that is does not know about to the manifest. This includes Flack and GEMINI extensions. … … 112 114 * Test the rspec on ExoGENI using Flack when it is ready 113 115 114 === Configuration ===116 === 4.5) Configuration === 115 117 * Test the initialize/instrumentize scripts work on ExoGENI nodes 116 118 * Ahmed has tested converting ExoGENI manifest into UNIS schema … … 118 120 * Ilia will look into possibly adding these to the ExoGENI rspec 119 121 120 === Certificates ===122 === 4.6) Certificates === 121 123 * All four types of certificates should work for GENI Desktop login and instrumentize 122 124 123 === Tickets === 124 These are tickets addressing issues that GEMINI has also encountered during testing/investigation: 125 126 http://groups.geni.net/exogeni/ticket/109: SSH Keys: Only one ssh key is installed 127 128 === Testing === 125 126 127 === 4.7) Testing === 129 128 130 129 ==== Certificate Compatibility ==== … … 142 141 || '''Safari''' || || || N/A || 143 142 144 145 ----- 146 147 == Team == 143 ==== Tickets ==== 144 These are tickets addressing issues that GEMINI has also encountered during testing/investigation: 145 146 http://groups.geni.net/exogeni/ticket/109: SSH Keys: Only one ssh key is installed 147 148 149 == 5) Team == 148 150 149 151 Jeanne Ohren (BBN) … … 159 161 Cong Wang (UMass Amherst) 160 162 161 ----- 162 163 == Planning and Status Meetings ==163 164 165 == 6) Planning and Status Meetings == 164 166 165 167 041113 … … 179 181 072113 - 072313 is GEC17 180 182 181 ----- 182 183 == Task List ==183 184 185 == 7) Key Task List == 184 186 185 187 || '''ID''' || '''Description''' || '''Assignee''' || '''Due''' || '''Status''' || '''Notes''' ||