| 8 | |
| 9 | This wiki page serves as the Status Report following GEC10 for the IMF project. |
| 10 | |
| 11 | * Draft created by Rudra Dutta on March 22, 2011 |
| 12 | * Modified by Rudra Dutta March 22 - April ? 2011 |
| 13 | * Final version released April ? 2011 |
| 14 | |
| 15 | Upon consultation with GPO, the priorities of the project were revisited for Year 2 of this project. As a result, Year 2 (Spiral 3) goals were focused on integrating the developed IMF capabilities for measurement, and transfer of measurement (from substrate to in-slice stack), with existing GENI Inst&Meas capabilities; specifically, to integrate and install perfSONAR (pS) MPs and archives to collect performance measurement data from Polatis switches and Infinera DWDM platforms on 4 BEN sites, and (subsequently) integrate pS MP polling, or adopt other GENI I&M capabilities, into IMF to mediate the ability of in-slice reactive protocols to communicate back to actuators in the substrate. |
| 16 | |
| 17 | At GEC10, the first of these (collecting performance data from Polatis using pS) capability has been completed. This leverages Spiral 3 goals of the ERM project team, who also form the Columbia U part of the IMF team. |