Changes between Version 14 and Version 15 of GeniNetworkStitchingConfirmationTests


Ignore:
Timestamp:
07/28/14 11:37:30 (10 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GeniNetworkStitchingConfirmationTests

    v14 v15  
    3535A stitching test between the new site and the GPO IG rack will be performed which uses two stitched links between the 2 sites sites using OpenVZ VMs:
    3636
    37 [[Image(IG-ST-2-ion.jpg)]]
     37  [[Image(IG-ST-2-ion.jpg)]]
    3838
     39If the New IG site is connected to AL2S, then it will be connected to another AL2S site rather than the GPO IG ION site.
     40
     41  [[Image(IG-ST-2-al2s.jpg)]]
    3942
    4043=== IG-ST-3 New Site 3 node linear topology ===
     
    4245A stitching test that will use the new site as part of a linear topology, where each rack reserves one host and traffic is exchanged between the end-points:
    4346
    44 [[Image(IG-ST-3-ion.jpg)]]
     47  [[Image(IG-ST-3-ion.jpg)]]
    4548
    4649=== IG-ST-4 New Site to GPO EG interoperability ===
     
    4851A stitching test between the new site and the GPO EG rack will be performed for each network path available at the new site. For each stitching path tested in this test case, performance data will be captured between the New IG site and GPO EG for TCP, UDP and ping statistics.
    4952
    50 [[Image(IG-ST-4-ion.jpg)]]
     53  [[Image(IG-ST-4-ion.jpg)]]
    5154
    5255If the New IG site is connected to AL2s and the GPO EG is connected to ION, the following topology will be verified:
    5356
    54 [[Image(IG-ST-4-al2s.jpg)]]
     57  [[Image(IG-ST-4-al2s.jpg)]]
    5558
    5659''Note'':  Test was modified to use dedicated hosts (raw-pcs) to collect performance data.  Also plan to switch the ExoGENI host to bare metal, when stitching to bare metal is supported.