Changes between Version 99 and Version 100 of GeniInstMeas


Ignore:
Timestamp:
07/19/11 11:23:39 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GeniInstMeas

    v99 v100  
    7575An effort is underway to define and document the [wiki:GeniInstrumentationandMeasurementsArchitecture  GENI Instrumentation and Measurements Architecture].
    7676
    77 Plan:[[BR]]
    78  Completed by GEC7:  v0.1 DRAFT, by GPO [[BR]]
    79  Completed by GEC8:  v0.5 DRAFT, by GPO, with revised outline and contributions after 2nd workshop[[BR]]
    80  In preparation:  v1.0 DRAFT, including contributions from WG[[BR]]
    81 
    82 A first DRAFT (v0.1) was completed by the GPO:  [http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/030810%20%20GENI-SE-IM-ARCH-0.1.pdf  GENI I&M Architecture (Document ID: GENI-SE-IM-ARCH-0.1, Date:  March 8, 2010)] [[BR]]
    83  This DRAFT includes proposed I&M services and a proposed configuration [[BR]] [[BR]]
    84 
    85 A second DRAFT (v0.5) was completed by the GPO, with input from the 2nd I&M Workshop:  [http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/072210%20%20GENI-SE-IM-ARCH-0.5.pdf  GENI I&M Architecture (Document ID: GENI-SE-IM-ARCH-0.5, Date:  July 22, 2010)] [[BR]]
    86  This DRAFT has a revised outline. [[BR]]
    87 
    88 A third DRAFT (v1.0) is in preparation, with input from the WG.   [[BR]]
    89  The community is invited to help prepare and review this draft, and provide comments, additions or changes to the Inst&Meas WG SE, Harry Mussman, at hmussman@bbn.com
     77A third DRAFT (v1.0) was completed by the GPO, with input from the WG:
     78[http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/122010i%20GENI-SE-IM-ARCH-1.0.doc    GENI I&M Architecture (Document ID: GENI-SE-IM-ARCH-1.0, Date:  December 20, 2010)] [[BR]]
     79
     80The figures are currently in separate files:  [[BR]]
     81[http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/Visio-4.x%20%20030911%20_IM-ARCH-Figures.pdf    Figures 4.x]  [[BR]]
     82[http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/Visio-6.x%20%20%20%20012711%20Topic5MangSrvcs%20%20%20Proxy%20%20%20IM-ARCH-Figures.pdf    Figures 6.x]  [[BR]]
     83[http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/Visio-7.x%20%20012711%20%20_All_IM-ARCH-Figures.pdf    Figures 7.x]   [[BR]]
     84[http://groups.geni.net/geni/attachment/wiki/GeniInstrumentationandMeasurementsArchitecture/Visio-16.x%20%20%20%20012711%20MeasDataArchiveSrvc_IM-ARCH-Figures.pdf    Figures 16.x]  [[BR]]
     85
     86The community is invited to help prepare and review this draft, and provide comments, additions or changes to the Inst&Meas WG SE, Harry Mussman, at hmussman@bbn.com
     87
    9088
    9189