Version 5 (modified by 13 years ago) (diff) | ,
---|
-
Cluster-D Meetings at GEC9, Agenda and Notes
- Introductions (12 noon)
- Review of current status near the end of Spiral 2, and plans for Spiral 3
- Project Reviews (From 1:00pm through 2:40pm)
- Break (From 2:40pm through 3:00pm)
- Plan for GEC10 demos/experiments (3:00pm - 3:15pm)
- Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm)
- Adjourn (4:30pm)
- References
Cluster-D Meetings at GEC9, Agenda and Notes
Tuesday, Nov 2, 12noon - 4:30pm
TENTATIVE
Introductions (12 noon)
Review of current status near the end of Spiral 2, and plans for Spiral 3
Spiral 2 and Spiral 3 Goals (12:10pm, Mussman)
The following goals have been established by the GPO for Spiral 2.
Goal 1: Live experiments, the central goal of Spiral 2. Support significant numbers of research experiments in the end-to-end prototype systems. The GPO expects live experimentation to begin near the end of Spiral 1, which will intensify through Spiral 2 as we begin continuous operation of the prototype systems. This will begin to give us all substantial (early) operational experience, as these experiments will help us all understand the prototypes' strengths and weakness, which will drive our Spiral 3 goals.
Goal 2: Identity management
Goal 3: Improved integration of data & control planes, within clusters
Goal 4: Instrumentation
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate
For Spiral 3, these goals are reaffirmed, and particularly:
Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API
ORCA Features Spiral 2 report and Spiral 3 roadmap (12:20pm, Baldine)
- Upcoming Bella 2.2 status
- Bella 2.2 Features in detail
- XMLRPC controller
- Eucalyptus integration and NEuca extensions
- Euca site experiment topology embedding
- Format conversions (http://geni-test.renci.org:11080/ndl-conversion/convert.jsp)
- Actor registry
- Bella 3.x upcoming Spiral 3 features
- New substrate support
- Experiment support
- Authentication and authorization
- ProtoGENI interoperability
- Connectivity planning
- Naming and format conversions
- Handlers and policies
- Tools integration
- Clearinghouse and intra-cluster connectivity
- Status
- Actor registry
- Future
Project Reviews (From 1:00pm through 2:40pm)
Each project should prepare NO MORE THAN THREE slides for presentation, and upload to the wiki below:
1) Current status near end of Spiral 2, and plans for Spiral 3:
2) Connectivity capabilities, now near end of Spiral 2, and plans for Spiral 3:
Control framework message flows?
Component programming via SSH?
VLAN connectivity to Internet 2? NLR? How many VLANs? (Goal: By 10/1/09)
Ability to control setup of VLANs as part of experiment? (Goal: By 3/16/10, GEC7)
Ability to control setup of VLANs as part of experiment involving multiple aggregates? (Goal: By 7/20/10, GEC8)
3) Experiment capabilities, now near end of Spiral 2, and plans for Spiral 3:
Ready to use by outside researchers? How is it done? (Goal: By 11/16/09, GEC6)
Use by outside researchers? What has been done?
Use involving multiple aggregates? What has been done? (Goal: By 7/20/10, GEC8)
Use for research experiments? What has been done?
ORCA/BEN (1:00pm)
Ilia Baldine
DOME (1:10pm)
Brian Lynn
ViSE (1:20pm)
David Irwin
DICloud (1:30pm)
Michael Zink
KANSEI (1:40pm)
Anish Aurora
OKGems (1:50pm)
Andy Li
ERM: Embedded real-time substrate measurements for real-time cross-layer experiments (2:00pm)
Keren Bergman, Caroline Lai, Michael Wang
LEARN Measurement Handler and Network Integration (2:10pm)
Deniz Gurkan presentation
IMF (2:20pm)
Rudra Dutta
iGENI (2:30pm)
Joe Mambretti, Jim Chen
Break (From 2:40pm through 3:00pm)
Plan for GEC10 demos/experiments (3:00pm - 3:15pm)
Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm)
For Spiral 3, these goals are reaffirmed, and particularly:
Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API
ORCA features:
XML-RPC interface, compatible with GENI AM API
Shibboleth interop
Cluster D clearinghouse:
Operational readiness
Connectivity by aggregates
Features
Cluster D connectivity:
Control framework message flows
Component programming via SSH
VLAN connectivity to Internet 2 or NLR Many VLANs
Bridge between backbone networks
Ability to control setup of VLANs as part of experiment
Ability to control setup of VLANs as part of experiment involving multiple aggregates
Experiments:
Use by outside researchers
Use involving multiple aggregates
Use for research experiments
Adjourn (4:30pm)
References
Attachments (16)
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_1.jpg (427.3 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_2.jpg (346.7 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_3.jpg (336.0 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_4.jpg (387.0 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_5.jpg (351.7 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings_Page_6.jpg (363.5 KB) - added by 13 years ago.
- Visio-102810_partial_ClusterD_Spiral3_Drawings.pdf (68.4 KB) - added by 13 years ago.
- 110210 GEC9_Agenda_ClusterD_ORCA.ppt (1.2 MB) - added by 13 years ago.
-
LEARN GEC9 DGurkan.pptx (547.2 KB) - added by 13 years ago.
LEARN presentation
- GEC9Cluster-Kansei.pptx (623.8 KB) - added by 13 years ago.
- GEC9 DiCloud Cluster D session.ppt (264.0 KB) - added by 13 years ago.
- GEC9_ERM_ClusterD.pptx (1.6 MB) - added by 13 years ago.
- GEC9-cluster-D-ORCA-overview.pptx (1.7 MB) - added by 13 years ago.
- iGENI-D Presentation-GEC 9 Mambretti.ppt (977.5 KB) - added by 13 years ago.
- Imfgec9slides.ppt (384.5 KB) - added by 13 years ago.
- nowcast-final.pptx (5.0 MB) - added by 13 years ago.