Version 7 (modified by 14 years ago) (diff) | ,
---|
-
Cluster-D Meetings at GEC8, Agenda and Notes
- Introductions (12 noon)
- Review of current status near the end of Spiral 2, and plans for Spiral 3
- Break (From 2:40pm through 3:00pm)
- Plan for GEC9 demos/experiments (3:00pm - 3:15pm)
- Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm)
- Discussion of Solicitation 3 Possibilities (4:00pm - 4:30pm)
- Adjourn (4:30pm)
Cluster-D Meetings at GEC8, Agenda and Notes
Tuesday, July 22, 12noon - 4:30pm
Introductions (12 noon)
Review of current status near the end of Spiral 2, and plans for Spiral 3
Spiral 2 and Spiral 3 Goals (12:10pm, Mussman)
The following goals have been established by the GPO for Spiral 2.
Goal 1: Live experiments, the central goal of Spiral 2. Support significant numbers of research experiments in the end-to-end prototype systems. The GPO expects live experimentation to begin near the end of Spiral 1, which will intensify through Spiral 2 as we begin continuous operation of the prototype systems. This will begin to give us all substantial (early) operational experience, as these experiments will help us all understand the prototypes' strengths and weakness, which will drive our Spiral 3 goals.
Goal 2: Identity management
Goal 3: Improved integration of data & control planes, within clusters
Goal 4: Instrumentation
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate
For Spiral 3, these goals are reaffirmed, and particularly:
Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API
ORCA Software Releases for Spirals 2 and 3 (Baldine, 12:20pm)
Roadmap
The ORCA software releases are currently scheduled for every 4 mo. , and include work done by both Solicitation 1 (1582) and Solicitation 2 (1700) ORCA projects.
ORCA Rel 1.3 10/1/2009
ORCA Rel 2.0 (was 2.1) 2/1/10
ORCA Rel 2.1 (was 2.2) 6/1/10
ORCA Rel 2.2 (was 2.3) 10/1/10
More in Spiral 3?
Status
Current progress on each feature, including:
Known issues
XML-RPC interface
Shibboleth interop
+ XML-RPC Controller
- Goal: Provide an XML-RPC interface to ORCA for experiment control tools and external users
- Tools/users would use this interface to
. discover available resources
. instantiate and destroy experiment slivers
- Initial version of ProtoGENI-like XML-RPC interface available on an ORCA SM
- Generic slice manager acts on behalf of experiment control tools/user
- Details of control framework hidden from user
- These interfaces provide a minimal set of features
. DiscoverResources(), CreateSliver(), DeleteSliver()
- Extended set of features (available later) would include
. GetTicket(), RedeemTicket(), UpdateTicket(), UpdateSliver()
. Support for resource representation using NDL
Additional features under consideration for Spiral 3:
Cluster D Operating Capabilities and Clearinghouse (Baldine, 12:40pm)
Roadmap
Status
Actor Registry and XML-RPC Controller
+ ORCA Actor Registry
- Snapshot of available actors from various ORCA containers
— Users can use this for resource discovery and other queries
- Users can visit http://geni.renci.org/actors.php to view current set of actors registered with the registry
- Users can also programmatically query the registry using an XML-RPC interface
Project Reviews (From 1:00pm through 2:40pm)
Each project should prepare three slides for presentation, and upload to the wiki below:
1) Current status near end of Spiral 2, and plans for Spiral 3
2) Connectivity capabilities
3) Experiment capabilities
ORCA/BEN (1:00pm)
Ilia Baldine
DOME (1:10pm)
Brian Lynn
ViSE (1:20pm)
David Irwin
DICloud (1:30pm)
Michael Zink
KANSEI (1:40pm)
Anish Aurora
OKGems (1:50pm)
Andy Li
ERM: Embedded real-time substrate measurements for real-time cross-layer experiments (2:00pm)
Keren Bergman, Caroline Lai, Michael Wang
LEARN Measurement Handler and Network Integration (2:10pm)
Deniz Gurkin[[BR]
IMF (2:20pm)
Rudra Dutta
iGENI (2:30pm)
Joe Mambretti, Jim Chen
Break (From 2:40pm through 3:00pm)
Plan for GEC9 demos/experiments (3:00pm - 3:15pm)
Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm)
For Spiral 3, these goals are reaffirmed, and particularly:
Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API
ORCA features:
XML-RPC interface, compatible with GENI AM API Shibboleth interop
Cluster D clearinghouse:
Operational readiness Connectivity by aggregates Features
Cluster D connectivity:
Control framework message flows Component programming via SSH VLAN connectivity to aggregates VLAN connectivity between aggregates
Experiments:
Use by outside researchers Use involving multiple aggregates Use for research experiments
Discussion of Solicitation 3 Possibilities (4:00pm - 4:30pm)
GENI rack other?
Adjourn (4:30pm)
Attachments (14)
-
LEARN GEC8 DGurkan.pptx (436.8 KB) - added by 14 years ago.
LEARN update presentation for GEC8
-
DOME-ClusterD.pdf (3.5 MB) - added by 14 years ago.
DOME's 3 Slides
-
GEC8 CloudControl.ppt (348.0 KB) - added by 14 years ago.
DiCloud - Spiral 2 status and Spiral 3 plans (3 slides)
- DOME-ClusterD.2.pdf (3.5 MB) - added by 14 years ago.
- GEC8 CloudControl.2.ppt (350.5 KB) - added by 14 years ago.
- gec8 vise.pptx (530.6 KB) - added by 14 years ago.
- GEC8_ClusterD_ERM.pdf (1.6 MB) - added by 14 years ago.
- GEC8-cluster-D-ORCA-overview.pptx (314.1 KB) - added by 14 years ago.
- GEC8-Cluster-Meeting-Slides-0.2 kansei .pdf (898.9 KB) - added by 14 years ago.
- GEC8-ORCA-BEN-experiments-and-connectivity.pptx (307.1 KB) - added by 14 years ago.
- iGENI-Cluster-D Presentation-Mambretti.pptx (3.7 MB) - added by 14 years ago.
- imf_cluster_d_meet_gec8.pptx (1.2 MB) - added by 14 years ago.
- LEARN GEC8 DGurkan.2.pptx (436.8 KB) - added by 14 years ago.
- OKGems-GEC8-Oklahoma-State-University.pdf (767.1 KB) - added by 14 years ago.