Changes between Version 14 and Version 15 of GIMIv2tasks


Ignore:
Timestamp:
04/23/13 10:28:32 (11 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GIMIv2tasks

    v14 v15  
    4242 042213  discuss iticket for iRODS
    4343
    44  043013
     44 042913
    4545
    46  051413  demo
     46 051313  demo
    4747
    48  052813
     48 052713
    4949
    50  061113  demo;  bulk of work done on v2 GIMI Portal
     50 061013  demo;  bulk of work done on v2 GIMI Portal
    5151
    52  062513
     52 062413
    5353
    54  070913  demo;  v2 ready for testing
     54 070813  demo;  v2 ready for testing
    5555
    5656 072113 - 072313 is GEC17;  v2 software released after testing; integrated tutorials presented
     
    130130       
    1311318)  Overall schedule: [[BR]]
    132         a)  By 6/11:  We need to have the bulk of the work done on GIMI Portal no later than 6/11 [[BR]]
     132        a)  By 6/10:  We need to have the bulk of the work done on GIMI Portal no later than 6/10 [[BR]]
    133133        b)  By 7/8:  v2 ready for testing [[BR]]
    134134        c)  On 7/21 - 7/23  at GEC17:  v2 software released after testing;  integrated tutorials presented  [[BR]]