    9292    g)  Current InstaGENI configuration per attached figure;  changes? [[BR]]
    9393    h)  Current ExoGENI configuration? [[BR]]
    94 
    95     i)  By 4/15:  Jeanne will have met with team, and provide report of DRAFT plan [[BR]]
     94        i)  By 4/15:  Jeanne will have met with team, and provide report of DRAFT plan [[BR]]
    9695       
    97965)  Decide on configuration of GIMI Portal service, and complete development. [[BR]]
    9897        a)  On 4/2:  Reconfirm that will continue as a multi-user persistent service, with account for each user, to retain advantages of a persistent sink for measurement data.  However, encourage users to move completed measurements to iRODS, so that we do not end up with long-term storage of measurement data within GIMI Portal Service. [[BR]]
    99        
    10098        b)  Continue to include OML Server and Lab wiki (for orchestration, results, and documentation) [[BR]]
    10199        c)  Separate OML results, by experiment and user, per the defined method [[BR]]
     
    105103        g)  Realize workable authentication/authorization to iRODS;  start with current proxycert arrangement [[BR]]
    106104        h)  Do we want to support link from GENI Desktop?  or somehow include Lab wiki as a plug-in in the GENI Desktop? These could be a step towards a "consistent user interface". [[BR]]
    107 
    108105        i)  On 4/4:  We need a workable solution, not the “best” solution.  We can’t wait for future authentication/authorization mechanisms. [[BR]]
    109        
    110106        j)  On 4/4:  We need to have the bulk of the work done in 6-8 weeks (no later than 6/11), then cleanup towards GEC17.   [[BR]]
    111        
    112107        k)  On 4/4:  A small team will be organized to work on the problem, define multiple solutions, and pick the best we can do in the time allotted:  Jeanne, Cong, Mike (lead), Shu, (also web services expert from RENCI?), Max.  [[BR]]
    113 
    114108        l)  By 4/15, Mike will have met with team, and will provide a report, including:  evaluation of current Lab wiki code;  available options for authentication of user to iRODS (starting with current proxycert arrangement);  overview of current structure, and early view of possible options [[BR]]
    115109
     
    118112        b)  Add rules to move object to public archive directory, and manage any changes [[BR]]
    119113        c)  Integrate archive service with handle service [[BR]]
    120        
    121114        d)  By 4/15, Shu needs to summarize planned extensions, per his earlier document. [[BR]]
    122115