    1 = GR-ADM-6: Control Network Disconnection Test =
     1= OG-ADM-6: Control Network Disconnection Test =
    22
    33
    4 This page captures status for the test case GR-ADM-6. For additional information see the [wiki:GENIRacksHome/GRAMRacks/AcceptanceTestStatusDec2013 Acceptance Test Status - December 2013] page overall status, or the [wiki:GENIRacksHome/AcceptanceTests/GRAMAcceptanceTestsPlan GRAM Acceptance Test Plan] for details about the planned evaluation.
     4This page captures status for the test case OG-ADM-6. For additional information see the [wiki:GENIRacksHome/OpenGENIRacks/AcceptanceTestStatusDec2013 Acceptance Test Status - December 2013] page overall status, or the [wiki:GENIRacksHome/AcceptanceTests/OpenGENIAcceptanceTestsPlan OpenGENI Acceptance Test Plan] for details about the planned evaluation.
    55''Last Update: 2013/12/17"
    66
     
    3131== Step 2. Simulate Control node outage ==
    3232
    33  * Simulate an outage of each of the rack server host and control plane switch by disabling their respective interfaces on the BBN's control network switch.  Verify that GPO, GRAM, and GMOC monitoring all see the outage.
     33 * Simulate an outage of each of the rack server host and control plane switch by disabling their respective interfaces on the BBN's control network switch.  Verify that GPO, OpenGENI, and GMOC monitoring all see the outage.