Changes between Version 6 and Version 7 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics
- Timestamp:
- 02/27/13 09:39:08 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics
v6 v7 6 6 7 7 __IG-EXP-7: Click Router Experiment Acceptance Test__ ---> Expected Date: March 01 [[BR]] 8 9 8 Niky is modifying click router setup to run in two racks scenario. On 02/26 she was implementing click router environment workarounds. Expect to be able to run test by Friday March 1. 10 9 … … 13 12 14 13 __IG-ADM-1: Rack Receipt and Inventory Test__ ---> Expected Date: March 13 15 16 14 Only remaining blocker is government property tags. 17 15 18 16 __IG-ADM-3: Full Rack Reboot Test__ ---> Expected Date: March 11 [[BR]] 19 20 17 Need documentation by March 8th, would like to execute on March 11 [[BR]] 21 18 22 19 __IG-ADM-4: Emergency Stop Test__ ---> Expected Date: March 4 (March 5th alternate) [[BR]] 23 24 An Emergency Stop Procedure detailed test outline is being defined. The preparation steps are currently being executed and soordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time. 20 An Emergency Stop Procedure detailed test outline is being defined. The preparation steps are currently being executed and coordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time. 25 21 26 22