    7070The Emergency Stop Initiator contacts the GMOC Coordinator to initiate an emergency stop request describing the slice URN.  The GMOC walks quickly walks through their procedure, skipping more formal steps as needed, in order to contact the aggregate operator primary contact.
    7171
    72 == Step 5: Site Administrator receives Emergency Stop request ==
     72= Step 5: Site Administrator receives Emergency Stop request =
    7373
    74 === Step 5A (verify): Data passed from GMOC to Site Administrator is in expected format ===
     74== Step 5A (verify): Data passed from GMOC to Site Administrator is in expected format ==
    7575
    7676'''Using:'''
     
    8181 * There is a step for the Site Administrator to acknowledge that the GMOC's request is being processed
    8282
    83 === Step 5B (verify): Shut down procedure can be followed to successfully shut down a sliver ===
     83== Step 5B (verify): Shut down procedure can be followed to successfully shut down a sliver ==
    8484
    8585'''Using:'''
     
    9393 * Experimental traffic from the sliver is no longer being sent
    9494
    95 === Step 5C (verify): Documented procedure includes a step to follow up with GMOC ===
     95== Step 5C (verify): Documented procedure includes a step to follow up with GMOC ==
    9696
    9797'''Using:'''
     
    101101 * There is a step for the site administrator to follow up with the GMOC that a sliver has been shut down
    102102
    103 == Step 6 (verify): Documented procedure includes a clean-up step ==
     103= Step 6 (verify): Documented procedure includes a clean-up step ==
    104104
    105105'''Using:'''