43 | | |
44 | | |
45 | | = Step 1 (prep): InstaGENI, GPO, and GMOC select a time for test = |
46 | | |
47 | | This step covers the physical delivery of the rack to BBN, the transport of the rack inside BBN to the GPO lab, and the cabling, powering, and initial configuration of the rack. |
48 | | |
49 | | = Step 2: Configure and verify DNS = |
50 | | |
51 | | == Step 2A (verify): Find out what IP-to-hostname mapping to use == |
| 43 | FIXME: fill this in |
| 44 | |
| 45 | = Step 1 (prep): Site administrator reviews GMOC and InstaGENI sliver shutdown procedures = |
| 46 | |
| 47 | The site administrator should review the Emergency Stop procedure provided by the GMOC as well as the InstaGENI sliver shutdown procedure. The site administrator should identify parts of the procedure where they need to take action on the aggregate, and where they might need to interface with another party, such as the GMOC or an experimenter. This parts identified by the site administrator should be verified with the GMOC and with the InstaGENI team. |
| 48 | |
| 49 | = Step 2: (prep) GPO, GMOC, and InstaGENI team coordinate a time to run an ES test = |
| 50 | |
| 51 | The GPO will coordinate with parties at the GMOC and on the InstaGENI team to identify when an Emergency Stop test can be run. This test will focus primarily on the interactions with the site administator(s) and performing the procedures documented by the rack team, and a member of the GPO will act as the site administrator for this test. The site administrator must not communicate with the InstaGENI team or GMOC using outside channels, but other members of the GPO, the GMOC, and the InstaGENI team may communicate freely during the process. |
| 52 | |
| 53 | == Step 3 (verify): GMOC initiates test == |