Changes between Version 17 and Version 18 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-4


Ignore:
Timestamp:
02/26/13 11:39:07 (11 years ago)
Author:
tupty@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-4

    v17 v18  
    5151= Step 1 (prep): Site administrator reviews local site ES procedure, GMOC ES procedure, and InstaGENI sliver shut down procedure =
    5252
    53 The site administrator should review the local site shut down procedure, the ES procedure provided by the GMOC, and the InstaGENI sliver shut down procedure.  All of these procedures should make sense together, and the site administrator should follow the local site shut down procedure for the test.  The site administrator should identify parts of the local procedure where they need to take action on the aggregate, and they should reference the InstaGENI sliver shut down procedure for that part of the test.  He or she should also identify where the local site procedure requires interfacing with another party, such as the GMOC.  The parts identified by the site administrator should be verified with the GMOC and with the InstaGENI team.
     53The site administrator should review the local site ES procedure, the ES procedure provided by the GMOC, and the InstaGENI sliver shut down procedure.  All of these procedures should make sense together, and the site administrator should follow the local site ES procedure for the test.  The site administrator should identify parts of the local procedure where they need to take action on the aggregate, and they should reference the InstaGENI sliver shut down procedure for that part of the test.  He or she should also identify where the local site procedure requires interfacing with another party, such as the GMOC.  The parts identified by the site administrator should be verified with the GMOC and with the InstaGENI team.
    5454
    5555= Step 2 (prep): GPO, GMOC, and InstaGENI team coordinate a time to run an ES test =
     
    7575
    7676'''Using:'''
    77  * Local site shut down procedure
     77 * Local site ES procedure
    7878 * Documented InstaGENI sliver shut down procedure
    7979 * GMOC monitoring tools
     
    8181'''Verify:'''
    8282 * The GMOC sends a request with slice-specific or sliver-specific data in a format that can be fed into the shut down procedure
    83  * There is a step in the local site shut down procedure for the Site Administrator to acknowledge that the GMOC's request is being processed
     83 * There is a step in the local site ES procedure for the Site Administrator to acknowledge that the GMOC's request is being processed
    8484 * The Site Administrator can identify the experimenter's email address, username, and affiliation with the information provided by the GMOC and GMOC monitoring tools
    8585
     
    9999
    100100'''Using:'''
    101  * Local site shut down procedure
     101 * Local site ES procedure
    102102
    103103'''Verify:'''