Changes between Version 55 and Version 56 of GENIRacksHome/ExogeniRacks


Ignore:
Timestamp:
04/08/13 13:50:52 (11 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/ExogeniRacks

    v55 v56  
    3939The GPO works with Campus Engineering and the ExoGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the [wiki:GENIRacksHome/GENIRacksDeploymentSites ExoGENI Sites] installation.
    4040
    41 The GPO also executed '''[wiki:GENIRacksHome/ExogeniRacks/SiteConfirmationTests ExoGENI New Site Confirmation Tests]''' to validate the introduction of each new ExoGENI site.
    42 
    43 See the '''[wiki:GENIRacksHome/ExogeniRacks/ConfirmationTestStatus ExoGENI Confirmation Test Status]''' page for all new ExoGENI sites. This page captures status as sites are deployed and validated for general use by Experimenters. Upon completion of the site confirmation tests, campus engineering will be able to manage resources and access monitoring data for their site.
     41The GPO also executed '''[wiki:GENIRacksHome/ExogeniRacks/SiteConfirmationTests ExoGENI New Site Confirmation Tests]''' to validate the introduction of each new ExoGENI site.  See the '''[wiki:GENIRacksHome/ExogeniRacks/ConfirmationTestStatus ExoGENI Confirmation Test Status]''' page for all new ExoGENI sites. This page captures status as sites are deployed and validated for general use by Experimenters. Upon completion of the site confirmation tests, campus engineering will be able to manage resources and access monitoring data for their site.
    4442
    4543The GPO additionally creates a test slice that run continuously even after the confirmation tests.  This slice is part of the Plastic Slices measurements experiment and collects measurement data that can be found <<insert_link_here>>.