Version 5 (modified by 11 years ago) (diff) | ,
---|
OESS-T2: Two Site Cross-connect tests
This test case verifies Two Site Cross-connect scenarios. For overall status see the GENI OESS Topologies Test Status page.
Test Status
This section captures the status for each function verified by this test plan.
Scenario | State | Ticket | Notes |
1. ION to AL2S experiment | |||
2. Meso-scale to AL2S experiment | |||
3. AL2S to AL2s experiment |
State Legend | Description |
Color(green,Pass)? | Test completed and met all criteria |
Color(#98FB98,Pass: most criteria)? | Test completed and met most criteria. Exceptions documented |
Color(red,Fail)? | Test completed and failed to meet criteria. |
Color(yellow,Complete)? | Test completed but will require re-execution due to expected changes |
Color(orange,Blocked)? | Blocked by ticketed issue(s). |
Color(#63B8FF,In Progress)? | Currently under test. |
Test Execution Details
Two endpoints will be connected with the cross-connects defined in each section below.
1. ION to AL2S experiment
An ION to AL2S experiment will connect GPO IG ION to MAX IG AL2S.
2. Meso-scale to AL2S experiment
A Meso-scale to AL2S experiment will connect GPO IG ION to Meso-scale VLAN to MAX AL2S. Or if available, experiment may use NYU IG Meso-scale to MAX IG AL2S.
3. AL2S to AL2s experiment
An AL2S to AL2s experiment will connect MAX IG AL2S to an AL2S Test Point. Note, AL2S test-points are available and will be used throughout testing to help establish network connections defined in this plan.