Task List
These tasks are based on the attached integration plan: attachment:051412b_GEMINI_IntegrationPlan.txt.
ID | Task | Owner | Due | Status
|
1.1 | User workspace VM | Jeanne | 5/23 | In Progress 25%
|
1.2 | Find reference experiment | Jeanne | 5/23 | In Progress 5%
|
1.3 | Document reference cases | | 5/23 |
|
1.4 | Specify and document rspec extensions | | 5/23 |
|
2.1 | Issue tracker | Jeanne | 5/23 | In Progress 75%
|
3.1 | New UNIS at IU | | 5/23 |
|
3.2 | Move Old UNIS to IU | | 5/23 |
|
3.3 | Move LAMP CA to IU | | 5/23 |
|
3.4 | iRODS at UK | Hussam | 5/23 |
|
3.5 | GEMINI Portal at UK | Charles | 5/23 |
|
4.1 | Complete modules | | 6/6 |
|
4.2 | Package active network measurement (ANM) modules | | 6/6 |
|
4.3 | Separate entry into presentation GUI | | 6/6 |
|
4.4 | Installation script for ANM modules | | 6/6 |
|
4.5 | Verify reference cases | | 6/6 |
|
5.1 | Complete modules | | 6/6 |
|
5.2 | Package passive host measurement (PHM) modules | | 6/6 |
|
5.3 | Installation script for PHM modules | | 6/6 |
|
5.4 | Add ability to verify config ? | | 6/6 |
|
5.5 | Verify reference cases | | 6/6 |
|
6.1 | Integrate ANM and PHM module installation scripts | | 6/20 |
|
6.2 | Verify reference cases for both ANM and PHM together | | 6/20 |
|
7.1 | Define acceptance test plan | Jeanne | 6/20 | In Progress 60%
|
7.2 | Execute acceptance tests | Jeanne | 6/20 | Not Started
|
8.1 | Coordinate tutorial with earlier tutorial | | 7/4 |
|
8.2 | Define use cases and reference experiments to be included | | 7/4 |
|
8.3 | Identify tutorial roles | | 7/4 |
|
8.4 | Prepare tutorial VM | | 7/4 |
|
8.5 | Prepare materials | | 7/4 |
|
Modules and scripts
New psConfig
|
New UNIS
|
Old UNIS to New UNIS translator
|
MS
|
Bootstrap script (instrumentize?)
|
Service watcher
|
PSBuoy/PINGER
|
PeriViz
|
Drupal CMS
|
PerfAdmin (Config and Presentation)
|
UNIS Encoder
|