Changes between Version 26 and Version 27 of GECDemoSubmission
- Timestamp:
- 04/28/14 18:17:49 (10 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GECDemoSubmission
v26 v27 8 8 accurate description. If you have done demonstrations before, make sure to highlight what is different about this 9 9 demonstration compared to previous ones. Indicate in your description who really should see the demo 10 and why (e.g. "Network providers that support OpenFlow should see this tool demonstration because it10 and why (e.g. "Network providers that support !OpenFlow should see this tool demonstration because it 11 11 will let them manage limited bandwidth efficiently.") 12 12 … … 25 25 26 26 27 Demo description paragraph :27 Demo description paragraph (three sentence minimum): 28 28 29 29 List of equipment that will need AC connections (e.g. laptop, switch, monitor): 30 30 Just put in the number of connections needed if your demo description already lists equipment. 31 31 32 Total number of wired network connections (sum IP and VLAN connections):32 Total number of wired network connections (sum standard IP and VLAN connections): 33 33 34 Number of wired layer 2 VLANs :34 Number of wired layer 2 VLANs (if any): 35 35 Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. 36 36