Changes between Version 25 and Version 26 of GECDemoSubmission
- Timestamp:
- 04/28/14 18:01:55 (10 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GECDemoSubmission
v25 v26 25 25 26 26 27 Demo description paragraph .27 Demo description paragraph: 28 28 29 List of equipment that will need AC connections (e.g. laptop, switch hardware prototype, monitor).30 (Just put in the number of connections needed if your demo description already lists the equipment)29 List of equipment that will need AC connections (e.g. laptop, switch, monitor): 30 Just put in the number of connections needed if your demo description already lists equipment. 31 31 32 Total number of wired network connections (sum IP AND VLAN connections).32 Total number of wired network connections (sum IP and VLAN connections): 33 33 34 Number of wired layer 2 VLANs . Specify VLAN number, if known, approximate bandwidth, and whether35 tagged or untagged.34 Number of wired layer 2 VLANs: 35 Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. 36 36 37 Number of wireless network connections (include required bandwidth if significant) .37 Number of wireless network connections (include required bandwidth if significant): 38 38 39 Number of static addresses needed (if any) .39 Number of static addresses needed (if any): 40 40 41 Monitor (y/n, specify VGA or DVI) 42 (Specify resolution only if your software has resolution restrictions.)41 Monitor (y/n, specify VGA or DVI): 42 Specify resolution only if your software has resolution restrictions. 43 43 44 Number of posters (max size poster boards are 30" x 40") 44 Number of posters (max size poster boards are 30" x 40"): 45 45 46 Special requests (include any specific network connectivity needs 46 Special requests: 47 Include any specific network connectivity needs 47 48 (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) 48 49