Changes between Version 5 and Version 6 of GEC21Agenda/WiMAXDevs
- Timestamp:
- 10/22/14 10:54:36 (10 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC21Agenda/WiMAXDevs
v5 v6 133 133 * Need to provide Ethernet switches 134 134 * Ubuntu Host to run Wimax-rf software 135 136 137 === 4.2) Write and Introduce New Services: Multiple Base-Station Mgmt Srvc and Data-Path GW Srvc === 135 * Follow Install procedure at http://wimax.orbit-lab.org/wiki/WiMAX/dSite 136 137 138 === 4.2) Write and Introduce New Services: Multiple Base-Station Mgmt Srvc and BS-Conf Srvc === 138 139 139 140 Ivan Seskar (Rutgers WINLAB) and Davide Pesavento (UCLA) [[BR]] … … 144 145 * 1) Have updated WiMAX RF AggMgr for NEC base station to 2.5.3+; additional updates coming [[BR]] 145 146 * Feeds management data to centralized DB at WINLAB, for GENI-wide monitoring [[BR]] 146 * Due: ? [[BR]] 147 147 148 148 149 * 2) New WiMAX RF AggMgr for Airspan base station [[BR]] 149 150 * Provides configuration, to replace Netspan; now running [[BR]] 150 151 * Provides node authorization, and measurements per client [[BR]] 151 * Could BBN, NYU Poly begin testing early version, to replace Netspan? [[BR]] 152 * Could early version be shipped to sites on yellow node, with OMF/OML? [[BR]] 153 152 154 153 * 3) Build WiMAX RF AggMgr that can control multiple BSs, either NEC and/or Airspan, with same API [[BR]] 155 154 * Should be useful for handover/multi-homing functions: shared white list of MS, allowed to connect to one BS or another [[BR]] 156 * What other features are needed? [[BR]] 157 * First version due: 3/15/13 [[BR]] 155 158 156 159 157 * Data-path GW Srvc: [[BR]] … … 162 160 * Includes OpenV switch (open-source OF) [[BR]] 163 161 * Should be useful for handover/multi-homing functions [[BR]] 164 * First version due: 3/15/13 [[BR]] 165 * Could there be an earlier version, that provides basic functions, and be manually configured? 166 * Could BBN, NYU Poly begin testing early version? [[BR]] 167 * Could early version be shipped to sites on yellow node? [[BR]] 162 168 163 169 164 What are next steps? [[BR]] … … 171 166 * Establish delivery schedule for WiMAX RF AggMgr releases [[BR]] 172 167 * Establish acceptance test plan by BBN, NYU Poly, for WiMAX RF AggMgr releases [[BR]] 173 * Finalize features for Data-path GW Srvcreleases [[BR]]174 * Establish delivery schedule for Data-path GW Srvcreleases [[BR]]168 * Finalize features for BS-Conf releases [[BR]] 169 * Establish delivery schedule for BS-Conf releases [[BR]] 175 170 * Establish acceptance test plan by BBN, NYU Poly, for WiMAX RF AggMgr releases [[BR]] 176 171 … … 186 181 187 182 Current status: [[BR]] 188 * [http://genimon.uky.edu GENI WiMAX Site Monitoring Dashboard]183 * [http://genimon.uky.edu GENI WiMAX Site Monitoring] 189 184 190 185 Next steps: [[BR]] … … 196 191 197 192 198 === 4. 6) Integration with GENI portal and making WiMAX Sites Accessible to Experimenters ===193 === 4.4) Integration with GENI portal and making WiMAX Sites Accessible to Experimenters === 199 194 200 195 Manu Gosain (GPO) [[BR]] … … 209 204 210 205 211 === 4. 7) Connect WiMAX Sites to Persistent I2 Backbone Network using AL2S and Integration of GENI racks and Wimax Base station controllers ===206 === 4.5) Connect WiMAX Sites to Persistent I2 Backbone Network using AL2S and Integration of GENI racks and Wimax Base station controllers === 212 207 213 208 Manu Gosain (GPO) and Ivan Seskar (WINLAB) [[BR]]