Changes between Version 14 and Version 15 of GEC21Agenda/ScalingUp/Procedure/Finish


Ignore:
Timestamp:
10/21/14 12:15:16 (10 years ago)
Author:
sedwards@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC21Agenda/ScalingUp/Procedure/Finish

    v14 v15  
    5757node_list=2,3,4,5
    5858}}}
     59  a. Change the name of the output file (replace `X` with the value from your worksheet) to:
     60{{{
     61output_rspec=bigsite-X.xml
     62}}}
    5963  a. Go back to the [../DesignSetup Design/Setup] and repeat everything from [../DesignSetup#a3.1GenerateRSpecbasedonexistingsmallertopology Step 3.1.d] onward.
    6064  a. How would you go about making a topology besides a star?  What if you wanted to install different software on one of the nodes?