Changes between Version 12 and Version 13 of GEC17Agenda/WiMAXDevelopers
- Timestamp:
- 07/20/13 09:22:28 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC17Agenda/WiMAXDevelopers
v12 v13 33 33 34 34 == 2) Spiral 5 Goals == 35 3:35pm [[BR]]35 8:35am [[BR]] 36 36 0min [[BR]] 37 37 … … 85 85 86 86 === 3.1) Cooperate with Clearwire === 87 3:35pm [[BR]]87 8:35am [[BR]] 88 88 Ivan Seskar (WINLAB) and Manu Gosain (GPO)[[BR]] 89 89 10min … … 119 119 120 120 === 3.2) Access to Sprint Broadband Services via MVNO Arrangements === 121 3:45pm [[BR]]121 8:45am [[BR]] 122 122 Jim Martin (Clemson Univ) [[BR]] 123 123 10min [[BR]] … … 133 133 134 134 == 4) Tasks == 135 4:00pm [[BR]] 135 136 136 137 137 … … 139 139 140 140 === 4.1) Build and Add Custom PC "Yellow Nodes" to WiMAX sites === 141 4:05pm [[BR]]141 9:05am [[BR]] 142 142 Ivan Seskar (WINLAB) [[BR]] 143 143 10min [[BR]] … … 171 171 172 172 Current schedule: [[BR]] 173 * Mother bods due 3/25 174 * metal cabinets being fabricated 175 * some units by mid-April 176 * all units by end of April 173 * All 32 nodes have been built 174 * tentative shipping date for sites is 7/27 177 175 178 176 Planned allocations: [[BR]] … … 182 180 Sites: 183 181 * Need to provide Ethernet switches 184 182 * Ubuntu Host to run Wimax-rf software 185 183 186 184 187 185 === 4.2) Write and Introduce New Services: Multiple Base-Station Mgmt Srvc and Data-Path GW Srvc === 188 4:15pm [[br]]186 9:15am [[br]] 189 187 Ivan Seskar (Rutgers WINLAB) and Davide Pesavento (UCLA) [[BR]] 190 188 10min [[BR]] … … 199 197 * Provides configuration, to replace Netspan; now running [[BR]] 200 198 * Provides node authorization, and measurements per client [[BR]] 201 * First version due: 12/15/12 [[BR]]202 199 * Could BBN, NYU Poly begin testing early version, to replace Netspan? [[BR]] 203 200 * Could early version be shipped to sites on yellow node, with OMF/OML? [[BR]] … … 240 237 241 238 === 4.3) Support Central Monitoring by Rutgers WINLAB === 242 4:25pm [[BR]]239 9:25am [[BR]] 243 240 Manu Gosain (GPO), Ivan Seskar (WINLAB) [[BR]] 244 241 0min [[BR]] … … 251 248 252 249 === 4.4) Write and Introduce Mobility/Handover/Multi-homing Services === 253 4:25pm [[BR]]250 9:25am [[BR]] 254 251 Parmesh Ramanathan (Wisconsin) [[BR]] 255 252 8min [[BR]] … … 293 290 294 291 === 4.5) Acquire and Add Android Handsets === 295 4:35pm [[BR]]292 9:35am [[BR]] 296 293 Derek Meyer (Univ Wisconsin)[[BR]] 297 294 5min [[BR]] … … 322 319 323 320 === 4.6) Integration with GENI portal and making WiMAX Sites Accessible to Experimenters === 324 4:45pm [[BR]]321 9:45am [[BR]] 325 322 Manu Gosain (GPO) [[BR]] 326 323 5min [[BR]] … … 331 328 332 329 === 4.7) Connect WiMAX Sites to Persistent I2 Backbone Network, with IP Routing, to Support Multi-site Experiments === 333 4:45pm [[BR]]330 9:45am [[BR]] 334 331 Manu Gosain (GPO) and Ivan Seskar (WINLAB) [[BR]] 335 332 0min [[BR]] … … 365 362 366 363 == 5) Status of GENI WiMAX site deployments == 367 4:45pm [[BR]]364 9:45am [[BR]] 368 365 Manu Gosain (GPO) and members of site teams [[BR]] 369 366 15min [[BR]] … … 407 404 408 405 === 6.1) Lab Experiments to Teach Wireless Basics === 409 5:00pm [[BR]]406 10:00am [[BR]] 410 407 Thanasis Korakis (NYU Poly) [[BR]] 411 408 0min [[BR]] … … 433 430 434 431 === 6.2) Multiple Site Experiment: Mobility First === 435 5:00pm [[BR]]432 10:00am [[BR]] 436 433 Kiran Nagaraja (WINLAB) [[BR]] 437 434 0min [[BR]] … … 453 450 454 451 === 6.3) WiMAX Tutorials at GEC17 === 455 5:00pm452 10:00am 456 453 Organized by NYU Poly [[BR]] 457 454 0min [[BR]] 458 455 459 [http://groups.geni.net/geni/wiki/GEC1 6Agenda/WiMAX-Tutorial WiMAX Tutorials at GEC16] [[BR]]456 [http://groups.geni.net/geni/wiki/GEC17Agenda/WimaxTutorial WiMAX Tutorials at GEC17] [[BR]] 460 457 461 458 462 459 === 6.4) Wireless Demos at GEC17 === 463 5:00pm460 10:00am 464 461 0min 465 462 … … 468 465 469 466 == 7) Adjourn == 470 5:00pm [[BR]]467 10:00am [[BR]] 471 468 472 469