Changes between Version 31 and Version 32 of GEC16Agenda/WiMAX-Developers
- Timestamp:
- 03/28/13 12:08:56 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC16Agenda/WiMAX-Developers
v31 v32 126 126 * Considering approach as discussed in earlier WiNTeB workshop 127 127 * Possible configuration, and cost, have been received. 128 * Need to complete a proposal, and submit to NSF .129 * How much of a res search market would there be for this service?128 * Need to complete a proposal, and submit to NSF; see { slides} for overview 129 * How much of a research market would there be for this service? 130 130 * Another advantage: provides a path to utilize (commercial) LTE 131 131 … … 210 210 211 211 Next steps: [[BR]] 212 * Review with Airspan ASAP, and define steps and schedule to be on-the-air 212 * Review with Airspan ASAP, and define steps and schedule to be on-the-air soon, e.g., by end of April. 213 213 214 214 … … 246 246 247 247 Current schedule: [[BR]] 248 248 * Mother bods due 3/25 249 * metal cabinets being fabricated 250 * some units by mid-April 251 * all units by end of April 249 252 250 253 Planned allocations: [[BR]] 251 * 8 high-speed 252 * 32 low speed 254 * 8 high-speed: 1 to each site 255 * 32 low speed: 3 to each site 256 257 Sites: 258 * Need to provide Ethernet switches 253 259 254 260 … … 297 303 298 304 299 Current design: [[BR]] 300 301 302 Current schedule: [[BR]] 303 305 Current design and schedule: [[BR]] 306 * See [ slides] 307 * Airspan config completed, need to be tested; Manu will assist 308 * NEC config in progress 309 * Client registration in progress; needs to be done by end of April 310 * Ivan has updated for OMF 5.4 304 311 305 312 Recommendations for sites: [[BR]]