Changes between Version 14 and Version 15 of GEC14Agenda/WiMAXDeploymentsAndExperiments


Ignore:
Timestamp:
07/03/12 17:47:58 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC14Agenda/WiMAXDeploymentsAndExperiments

    v14 v15  
    3939Suggested Approach  [[BR]]
    4040
    41 2  slides]  [[BR]]
     411  status slide]  [[BR]]
    4242
    4343
     
    5050
    5151
    52 2 slides]  [[BR]]
     521 configuration slide]  [[BR]]
    5353
    5454
     
    5757Ivan Seskar  (WINLAB)
    5858
    59 Update WiMAX RF AggMgr for NEC base station  [[BR]]
    60 New WiMAX RF AggMgr for Airspan base station  [[BR]]
    61 
    62 
    63 === 2.2)  Add mobility/handover functions  ===
     59Update WiMAX RF AggMgr for NEC base station (2.5.3+)  [[BR]]
     60Feed to centralized managment DB (at WINLAB)  [[BR]]
     61
     62[  2  config, status slides]  [[BR]]
     63 
     64Coming:  New WiMAX RF AggMgr for Airspan base station  [[BR]]
     65
     66
     67=== 2.4)  Add mobility/handover functions  ===
    64681:55pm  [[BR]]
    6569Parmesh Ramanathan  (Wisconsin)  [[BR]]
     
    7074Process to find a good solution?    [[BR]]
    7175
    72 [2  slides]  [[BR]]
    73 
    74 === 2.3)  Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" ===
     76[  1  status slide]  [[BR]] 
     77
     78=== 2.5)  Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" ===
    75792:00pm  [[BR]]
    7680Manu Gosain (GPO) and Ivan Seskar  (WINLAB) [[BR]]
    7781
    78 [2  slides]  [[BR]]
    79 
    80 === 2.8) Add OMF/OML to WiMAX Sites ===
     82Configuration, with interfaces, management, etc.  [[BR]]
     83How can these be provided to sites?  [[BR]]
     84
     85[  1  config, status slide]  [[BR]]
     86
     87=== 2.6) Add OMF/OML to WiMAX Sites ===
    81882:05pm  [[BR]]
    82 Manu Gosain (GPO), Fraida Fund (NYU Poly), Giovanni Pau (UCLA)  [[BR]]
    83 
    84 Equip a WiMAX site with full OMF/OML capabilities  [[BR]]
    85 Add Login Service for Remote Users [[BR]]
    86 Plan to Federate with ProtoGENI Cluster  [[BR]]
    87 
    88 [4  slides]  [[BR]]
    89 
    90 
    91 === 2.9)  Connect WiMAX Sites to I2 Backbone Network ===
     89Derek Meyer (Wisconsin), MAnu Gosain (GPO) [[BR]]
     90
     91Equip a WiMAX site with full OMF/OML capabilities, installing on VMs  [[BR]]
     92Include Login Service for Remote Users [[BR]]
     93
     94Coming:  Plan to Federate with ProtoGENI Cluster  [[BR]]
     95
     96[  1  config, status slide]  [[BR]]
     97
     98
     99=== 2.7)  Connect WiMAX Sites to I2 Backbone Network ===
    921002:15pm  [[BR]]
    93101Manu Gosain (GPO), Fraida Fund (NYU Poly), Ivan Seskar (WINLAB)  [[BR]]
     
    99107 Mesh of VLAN connections in I2 backbone  [[BR]]
    100108
    101 [4  slides]  [[BR]]
    102 
    103 
    104 === 2.10)  Remote Experiments for Tutorials ===
     109What other WiMAX sites can be added?  [[BR]]
     110
     111[  1  config, status slide]  [[BR]]
     112
     113=== 2.8)  Roaming Mobile Station using Android Handset ===
    1051142:20pm  [[BR]]
    106 Fraida Fund (NYU Poly)
    107 
    108 Typical arrangements for tutorials[[BR]]
    109 What other support is required for experimenters?[[BR]]
    110 
    111  
    112 === 2.10)  Roaming Mobile Station using Android Handset ===
    113 2:25  [[BR]]
    114115Harry Mussman (GPO)[[BR]]
    115116
     
    117118Possible:  Sprint MVNO arrangement for pay-as-you-go data service  [[BR]]
    118119
    119 
    120 
    121 == 3)  GENI WiMAX Site Deployment Status and Plans ==
    122 2:30pm  [[BR]]
     120[  1  status slide]  [[BR]]
     121
     122
     123== 3)  Experiments ==
     1242:25pm
     125
     126=== 3)  Types of experiments ===
     127
     128=== 3.1)  Local experiments ===
     129Manu Gosain (GPO)  [[BR]]
     130
     131=== 3.2)  Remote experiments, used for tutorials ===
     132Fraida Fund (NYU Poly)  [[BR]]
     133
     134=== 3.3)  Multi-Site experiments ===
     135
     136=== 3.4)  Gathering experimenters?  ===
     137
     138
     139
     140
     141== 4)  GENI WiMAX Site Deployment Status and Plans ==
     1422:35pm  [[BR]]
    123143
    124144Paper including sections on basic and extended WiMAX sites, and on WiMAX research and service experiments:    [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/020112b_ExtendingGENI_TridentCom2012.pdf  pdf]  [[BR]] 
     
    126146Current GENI WiMAX sites, licenses and base stations  [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/030912_GENIWiMAXSites_Frequencies.xls  spreadsheet]  [[BR]]
    127147
    128 === 3.1)  BBN Site Extension Plan ===
    129 2:30pm  [[BR]]
     148=== 4.1)  BBN Site Extension Plan ===
     1492:35pm  [[BR]]
    130150Manu Gosain (GPO)  [[BR]]
    131151
    132 Status [ 1 slides] [[BR]]
     152Status [[BR]]
    133153 Changing frequency, per request from Clearwrie  [[BR]]
    134154 Bringup Airspan  [[BR]] 
     
    139159  Connected;  working;  used for tutoriala [[BR]]
    140160
    141 
    142 
    143 === 3.2)  WINLAB/Rutgers University Site Extension Plan ===
    144 2:35pm  [[BR]]
     161[  2  status, experiments slides]  [[BR]]
     162
     163=== 4.2)  WINLAB/Rutgers University Site Extension Plan ===
     1642:40pm  [[BR]]
    145165Ivan Seskar (WINLAB) [[BR]]
    146166
    147 Status [1  slides] [[BR]]
     167Status [[BR]]
    148168 Bringup Airspan  [[BR]]
    149169 Remote access to BSs [[BR]]
    150170 Connect to I2 backbone network [[BR]]
    151171
    152 === 3.3)  UCLA Site Extension Plans ===
    153 2:40pm  [[BR]]
     172[  2  status, experiments slides]  [[BR]]
     173
     174
     175=== 4.3)  UCLA Site Extension Plans ===
     1762:45pm  [[BR]]
    154177Mario Gerla, Giovanni Pau (UCLA) [[BR]]
    155178
    156 Extension plan [ 4 slides] [[BR]]
     179Extension plan [[BR]]
    157180 Add x1 Airspan BS near UCLA dormitories;  possibly other BSs.  [[BR]] 
    158181 x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     
    164187 Connect to I2 backbone network  [[BR]]
    165188
    166 === 3.4)  Clemson University Site Deployment Plan ===
    167 2:45pm  [[BR]]
     189[  2  status, experiments slides]  [[BR]]
     190
     191
     192=== 4.4)  Clemson University Site Deployment Plan ===
     1932:50pm  [[BR]]
    168194K-C Wang, Reece Johnson (Clemson)
    169195[http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13-WiMAX-Clemson.pdf Clemson slides][[BR]]
    170196
    171197
    172 Extension plan [ 2 slides]  [[BR]]
     198Extension plan   [[BR]]
    173199 Add x1 Airspan BS near campus [[BR]]
    174200 Add x2 Airspan BS near Greenville;  connect via DOT fibers.  [[BR]]
     
    179205 Mobility and handover [[BR]]
    180206 Planned experiments [[BR]]
     207
     208[  2  status, experiments slides]  [[BR]]
     209
    181210 
    182 === 3.5)  University of Wisconsin Site Extension Plan ===
    183 2:50pm  [[BR]]
     211=== 4.5)  University of Wisconsin Site Extension Plan ===
     2122:55pm  [[BR]]
    184213Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
    185214
    186215
    187 Extension plan [ 2 slides] [[BR]]
     216Extension plan [[BR]]
    188217 Add Airspan to building/tower near Capitol.  [[BR]]
    189218 Connect via Madison unified fiber project  [[BR]]
     
    197226 Connect to I2 backbone network  [[BR]]
    198227
    199 
    200 === 3.6)  University of Michigan Site Deployment Plan ===
    201 2:55pm [[BR]]
     228[  2  status, experiments slides]  [[BR]]
     229
     230=== 4.6)  University of Michigan Site Deployment Plan ===
     2313:00pm [[BR]]
    202232Morley Mao  (Michigan)  [[BR]]
    203233
    204 Extension plan [ 2 slides] [[BR]]
     234Extension plan [[BR]]
    205235 Add one Airspan on top of building  [[BR]]
    206236 Will signals penetrate into buildings?  [[BR]]
     
    211241 Planned experiments [[BR]]
    212242
    213 === 3.7)  Wayne State University Site Deployment Plan ===
    214 3:00pm   [[BR]]
     243[  2  status, experiments slides]  [[BR]]
     244
     245
     246=== 4.7)  Wayne State University Site Deployment Plan ===
     2473:05pm   [[BR]]
    215248Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    216249
    217 Extension plan [ 2 slides] [[BR]]
     250Extension plan [[BR]]
    218251 Plan: one site with three sectors, and 3 Airspan base stations.  [[BR]] 
    219252 One frequency (10MHz) from Clearwire
     
    224257 Planned experiments [[BR]]
    225258
    226 
    227 === 3.8)  Temple University Site Deployment Plan ===
    228 3:05pm   [[BR]]
     259[  2  status, experiments slides]  [[BR]]
     260
     261=== 4.8)  Temple University Site Deployment Plan ===
     2623:10pm   [[BR]]
    229263Shan Lin, Jie Wu (Temple)  [[BR]]
    230264
    231 Extension plan [ 2 slides] [[BR]]
     265Extension plan [[BR]]
    232266 x1 (or x2?) Airspan base stations (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    233267 Two frequencies from Clearwire, shared with Drexel  [[BR]]
     
    236270 Planned experiments [[BR]]
    237271
    238 === 3.9)  Drexel University Site Deployment Plan ===
    239 3:10pm   [[BR]]
     272[  2  status, experiments slides]  [[BR]]
     273
     274
     275=== 4.9)  Drexel University Site Deployment Plan ===
     2763:15pm   [[BR]]
    240277Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
    241278
    242 Extension plan [ 2 slides] [[BR]]
     279Extension plan [[BR]]
    243280 x1 (or x2?) Airspan base stations (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    244281 Two frequencies from Clearwire, shared with Drexel  [[BR]]
     
    247284 Planned experiments [[BR]]
    248285
    249 === 3.10) UMass Amherst Site Update ===
    250 3:15pm   [[BR]]
     286[  2  status, experiments slides]  [[BR]]
     287
     288
     289=== 4.10) UMass Amherst Site Update ===
     2903:20pm   [[BR]]
    251291Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
    252292
    253 Status [ 2 slides]  [[BR]]
     293Status [[BR]]
    254294 Add OMF/OML  [[BR]]
    255295 Connect to I2 backbone network  [[BR]]
    256296 Planned experiments:  use to integrate GIMI tools [[BR]]
    257297
    258 
    259 === 3.11) NYU Poly Site Update ===
    260 3:20pm   [[BR]]
     298[  2  status, experiments slides]  [[BR]]
     299
     300=== 4.11) NYU Poly Site Update ===
     3013:25pm   [[BR]]
    261302Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
    262303
    263 Status [ 1 slides] [[BR]]
     304Status [[BR]]
    264305  Planned experiments [[BR]]
    265306
    266 
    267 === 3.12) Univ of Colorado at Boulder Site Update ===
    268 3:25pm   [[BR]]
     307[  2  status, experiments slides]  [[BR]]
     308
     309=== 4.12) Univ of Colorado at Boulder Site Update ===
     3103:30pm   [[BR]]
    269311Dirk Grunwald (Colorado)  [[BR]]
     312
     313Status  [[BR]]
     314 Add OMF/OML  [[BR]]
     315 Connect to I2 backbone network  [[BR]]
     316 Planned experiments [[BR]]
     317
     318[  2  status, experiments slides]  [[BR]]
     319
     320=== 4.13) Columbia University Site Update ===
     3213:35pm   [[BR]]
     322Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
    270323
    271324Status [ 1 slides]  [[BR]]
     
    274327 Planned experiments [[BR]]
    275328
    276 
    277 === 3.13) Columbia University Site Update ===
    278 3:30pm   [[BR]]
    279 Henning Schulzrinne, Jan Janak (Columbia)  [[BR]]
    280 
    281 Status [ 1 slides]  [[BR]]
    282  Add OMF/OML  [[BR]]
    283  Connect to I2 backbone network  [[BR]]
    284  Planned experiments [[BR]]
    285 
    286 
    287 == 4) Adjourn ==
    288 3:30pm  [[BR]]
     329[  2  status, experiments slides]  [[BR]]
     330
     331== 5) Adjourn ==
     3323:40pm  [[BR]]
    289333
    290334