Changes between Version 14 and Version 15 of GEC14Agenda/WiMAXDeploymentsAndExperiments
- Timestamp:
- 07/03/12 17:47:58 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC14Agenda/WiMAXDeploymentsAndExperiments
v14 v15 39 39 Suggested Approach [[BR]] 40 40 41 [ 2 slides] [[BR]]41 [ 1 status slide] [[BR]] 42 42 43 43 … … 50 50 51 51 52 [ 2 slides] [[BR]]52 [ 1 configuration slide] [[BR]] 53 53 54 54 … … 57 57 Ivan Seskar (WINLAB) 58 58 59 Update WiMAX RF AggMgr for NEC base station [[BR]] 60 New WiMAX RF AggMgr for Airspan base station [[BR]] 61 62 63 === 2.2) Add mobility/handover functions === 59 Update WiMAX RF AggMgr for NEC base station (2.5.3+) [[BR]] 60 Feed to centralized managment DB (at WINLAB) [[BR]] 61 62 [ 2 config, status slides] [[BR]] 63 64 Coming: New WiMAX RF AggMgr for Airspan base station [[BR]] 65 66 67 === 2.4) Add mobility/handover functions === 64 68 1:55pm [[BR]] 65 69 Parmesh Ramanathan (Wisconsin) [[BR]] … … 70 74 Process to find a good solution? [[BR]] 71 75 72 [ 2 slides] [[BR]]73 74 === 2. 3) Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" ===76 [ 1 status slide] [[BR]] 77 78 === 2.5) Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" === 75 79 2:00pm [[BR]] 76 80 Manu Gosain (GPO) and Ivan Seskar (WINLAB) [[BR]] 77 81 78 [2 slides] [[BR]] 79 80 === 2.8) Add OMF/OML to WiMAX Sites === 82 Configuration, with interfaces, management, etc. [[BR]] 83 How can these be provided to sites? [[BR]] 84 85 [ 1 config, status slide] [[BR]] 86 87 === 2.6) Add OMF/OML to WiMAX Sites === 81 88 2:05pm [[BR]] 82 Manu Gosain (GPO), Fraida Fund (NYU Poly), Giovanni Pau (UCLA) [[BR]] 83 84 Equip a WiMAX site with full OMF/OML capabilities [[BR]] 85 Add Login Service for Remote Users [[BR]] 86 Plan to Federate with ProtoGENI Cluster [[BR]] 87 88 [4 slides] [[BR]] 89 90 91 === 2.9) Connect WiMAX Sites to I2 Backbone Network === 89 Derek Meyer (Wisconsin), MAnu Gosain (GPO) [[BR]] 90 91 Equip a WiMAX site with full OMF/OML capabilities, installing on VMs [[BR]] 92 Include Login Service for Remote Users [[BR]] 93 94 Coming: Plan to Federate with ProtoGENI Cluster [[BR]] 95 96 [ 1 config, status slide] [[BR]] 97 98 99 === 2.7) Connect WiMAX Sites to I2 Backbone Network === 92 100 2:15pm [[BR]] 93 101 Manu Gosain (GPO), Fraida Fund (NYU Poly), Ivan Seskar (WINLAB) [[BR]] … … 99 107 Mesh of VLAN connections in I2 backbone [[BR]] 100 108 101 [4 slides] [[BR]] 102 103 104 === 2.10) Remote Experiments for Tutorials === 109 What other WiMAX sites can be added? [[BR]] 110 111 [ 1 config, status slide] [[BR]] 112 113 === 2.8) Roaming Mobile Station using Android Handset === 105 114 2:20pm [[BR]] 106 Fraida Fund (NYU Poly)107 108 Typical arrangements for tutorials[[BR]]109 What other support is required for experimenters?[[BR]]110 111 112 === 2.10) Roaming Mobile Station using Android Handset ===113 2:25 [[BR]]114 115 Harry Mussman (GPO)[[BR]] 115 116 … … 117 118 Possible: Sprint MVNO arrangement for pay-as-you-go data service [[BR]] 118 119 119 120 121 == 3) GENI WiMAX Site Deployment Status and Plans == 122 2:30pm [[BR]] 120 [ 1 status slide] [[BR]] 121 122 123 == 3) Experiments == 124 2:25pm 125 126 === 3) Types of experiments === 127 128 === 3.1) Local experiments === 129 Manu Gosain (GPO) [[BR]] 130 131 === 3.2) Remote experiments, used for tutorials === 132 Fraida Fund (NYU Poly) [[BR]] 133 134 === 3.3) Multi-Site experiments === 135 136 === 3.4) Gathering experimenters? === 137 138 139 140 141 == 4) GENI WiMAX Site Deployment Status and Plans == 142 2:35pm [[BR]] 123 143 124 144 Paper including sections on basic and extended WiMAX sites, and on WiMAX research and service experiments: [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/020112b_ExtendingGENI_TridentCom2012.pdf pdf] [[BR]] … … 126 146 Current GENI WiMAX sites, licenses and base stations [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/030912_GENIWiMAXSites_Frequencies.xls spreadsheet] [[BR]] 127 147 128 === 3.1) BBN Site Extension Plan ===129 2:3 0pm [[BR]]148 === 4.1) BBN Site Extension Plan === 149 2:35pm [[BR]] 130 150 Manu Gosain (GPO) [[BR]] 131 151 132 Status [ 1 slides][[BR]]152 Status [[BR]] 133 153 Changing frequency, per request from Clearwrie [[BR]] 134 154 Bringup Airspan [[BR]] … … 139 159 Connected; working; used for tutoriala [[BR]] 140 160 141 142 143 === 3.2) WINLAB/Rutgers University Site Extension Plan ===144 2: 35pm [[BR]]161 [ 2 status, experiments slides] [[BR]] 162 163 === 4.2) WINLAB/Rutgers University Site Extension Plan === 164 2:40pm [[BR]] 145 165 Ivan Seskar (WINLAB) [[BR]] 146 166 147 Status [1 slides][[BR]]167 Status [[BR]] 148 168 Bringup Airspan [[BR]] 149 169 Remote access to BSs [[BR]] 150 170 Connect to I2 backbone network [[BR]] 151 171 152 === 3.3) UCLA Site Extension Plans === 153 2:40pm [[BR]] 172 [ 2 status, experiments slides] [[BR]] 173 174 175 === 4.3) UCLA Site Extension Plans === 176 2:45pm [[BR]] 154 177 Mario Gerla, Giovanni Pau (UCLA) [[BR]] 155 178 156 Extension plan [ 4 slides][[BR]]179 Extension plan [[BR]] 157 180 Add x1 Airspan BS near UCLA dormitories; possibly other BSs. [[BR]] 158 181 x1 (2510 Mid: 2560MHz to 2630MHz) [[BR]] … … 164 187 Connect to I2 backbone network [[BR]] 165 188 166 === 3.4) Clemson University Site Deployment Plan === 167 2:45pm [[BR]] 189 [ 2 status, experiments slides] [[BR]] 190 191 192 === 4.4) Clemson University Site Deployment Plan === 193 2:50pm [[BR]] 168 194 K-C Wang, Reece Johnson (Clemson) 169 195 [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13-WiMAX-Clemson.pdf Clemson slides][[BR]] 170 196 171 197 172 Extension plan [ 2 slides][[BR]]198 Extension plan [[BR]] 173 199 Add x1 Airspan BS near campus [[BR]] 174 200 Add x2 Airspan BS near Greenville; connect via DOT fibers. [[BR]] … … 179 205 Mobility and handover [[BR]] 180 206 Planned experiments [[BR]] 207 208 [ 2 status, experiments slides] [[BR]] 209 181 210 182 === 3.5) University of Wisconsin Site Extension Plan ===183 2:5 0pm [[BR]]211 === 4.5) University of Wisconsin Site Extension Plan === 212 2:55pm [[BR]] 184 213 Suman Banerjee, Derek Meyer (Wisconsin) [[BR]] 185 214 186 215 187 Extension plan [ 2 slides][[BR]]216 Extension plan [[BR]] 188 217 Add Airspan to building/tower near Capitol. [[BR]] 189 218 Connect via Madison unified fiber project [[BR]] … … 197 226 Connect to I2 backbone network [[BR]] 198 227 199 200 === 3.6) University of Michigan Site Deployment Plan === 201 2:55pm [[BR]] 228 [ 2 status, experiments slides] [[BR]] 229 230 === 4.6) University of Michigan Site Deployment Plan === 231 3:00pm [[BR]] 202 232 Morley Mao (Michigan) [[BR]] 203 233 204 Extension plan [ 2 slides][[BR]]234 Extension plan [[BR]] 205 235 Add one Airspan on top of building [[BR]] 206 236 Will signals penetrate into buildings? [[BR]] … … 211 241 Planned experiments [[BR]] 212 242 213 === 3.7) Wayne State University Site Deployment Plan === 214 3:00pm [[BR]] 243 [ 2 status, experiments slides] [[BR]] 244 245 246 === 4.7) Wayne State University Site Deployment Plan === 247 3:05pm [[BR]] 215 248 Hongwei Zhang, Yu Chu (Wayne State) [[BR]] 216 249 217 Extension plan [ 2 slides][[BR]]250 Extension plan [[BR]] 218 251 Plan: one site with three sectors, and 3 Airspan base stations. [[BR]] 219 252 One frequency (10MHz) from Clearwire … … 224 257 Planned experiments [[BR]] 225 258 226 227 === 3.8) Temple University Site Deployment Plan === 228 3:05pm [[BR]] 259 [ 2 status, experiments slides] [[BR]] 260 261 === 4.8) Temple University Site Deployment Plan === 262 3:10pm [[BR]] 229 263 Shan Lin, Jie Wu (Temple) [[BR]] 230 264 231 Extension plan [ 2 slides][[BR]]265 Extension plan [[BR]] 232 266 x1 (or x2?) Airspan base stations (2510 Mid: 2560MHz to 2630MHz) [[BR]] 233 267 Two frequencies from Clearwire, shared with Drexel [[BR]] … … 236 270 Planned experiments [[BR]] 237 271 238 === 3.9) Drexel University Site Deployment Plan === 239 3:10pm [[BR]] 272 [ 2 status, experiments slides] [[BR]] 273 274 275 === 4.9) Drexel University Site Deployment Plan === 276 3:15pm [[BR]] 240 277 Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel) [[BR]] 241 278 242 Extension plan [ 2 slides][[BR]]279 Extension plan [[BR]] 243 280 x1 (or x2?) Airspan base stations (2510 Mid: 2560MHz to 2630MHz) [[BR]] 244 281 Two frequencies from Clearwire, shared with Drexel [[BR]] … … 247 284 Planned experiments [[BR]] 248 285 249 === 3.10) UMass Amherst Site Update === 250 3:15pm [[BR]] 286 [ 2 status, experiments slides] [[BR]] 287 288 289 === 4.10) UMass Amherst Site Update === 290 3:20pm [[BR]] 251 291 Mike Zink, Cong Wang (UMass Amherst) [[BR]] 252 292 253 Status [ 2 slides] [[BR]]293 Status [[BR]] 254 294 Add OMF/OML [[BR]] 255 295 Connect to I2 backbone network [[BR]] 256 296 Planned experiments: use to integrate GIMI tools [[BR]] 257 297 258 259 === 3.11) NYU Poly Site Update === 260 3:20pm [[BR]] 298 [ 2 status, experiments slides] [[BR]] 299 300 === 4.11) NYU Poly Site Update === 301 3:25pm [[BR]] 261 302 Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]] 262 303 263 Status [ 1 slides][[BR]]304 Status [[BR]] 264 305 Planned experiments [[BR]] 265 306 266 267 === 3.12) Univ of Colorado at Boulder Site Update === 268 3:25pm [[BR]] 307 [ 2 status, experiments slides] [[BR]] 308 309 === 4.12) Univ of Colorado at Boulder Site Update === 310 3:30pm [[BR]] 269 311 Dirk Grunwald (Colorado) [[BR]] 312 313 Status [[BR]] 314 Add OMF/OML [[BR]] 315 Connect to I2 backbone network [[BR]] 316 Planned experiments [[BR]] 317 318 [ 2 status, experiments slides] [[BR]] 319 320 === 4.13) Columbia University Site Update === 321 3:35pm [[BR]] 322 Henning Schulzrinne, Jan Janak (Columbia) [[BR]] 270 323 271 324 Status [ 1 slides] [[BR]] … … 274 327 Planned experiments [[BR]] 275 328 276 277 === 3.13) Columbia University Site Update === 278 3:30pm [[BR]] 279 Henning Schulzrinne, Jan Janak (Columbia) [[BR]] 280 281 Status [ 1 slides] [[BR]] 282 Add OMF/OML [[BR]] 283 Connect to I2 backbone network [[BR]] 284 Planned experiments [[BR]] 285 286 287 == 4) Adjourn == 288 3:30pm [[BR]] 329 [ 2 status, experiments slides] [[BR]] 330 331 == 5) Adjourn == 332 3:40pm [[BR]] 289 333 290 334