Changes between Version 13 and Version 14 of GEC14Agenda/WiMAXDeploymentsAndExperiments


Ignore:
Timestamp:
06/28/12 09:42:10 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC14Agenda/WiMAXDeploymentsAndExperiments

    v13 v14  
    184184Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
    185185
    186 Considering expansion to two possible locations:  Madison Metro;  and Dept of ? near Capitol.  [[BR]]
    187 Connect via Madison unified fiber project  [[BR]]
    188 Outside contributions for power and poles.  [[BR]]
     186
     187Extension plan [ 2 slides] [[BR]]
     188 Add Airspan to building/tower near Capitol.  [[BR]]
     189 Connect via Madison unified fiber project  [[BR]]
     190 Outside contributions for power and poles.  [[BR]]
    189191 x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    190 
    191 Extension plan [ 4 slides] [[BR]]
    192192 License status [[BR]]
    193193 Location and backhaul [[BR]]
    194194 Mobility and handover [[BR]]
    195195 Planned experiments [[BR]]
     196 Add OMF/OML  [[BR]]
     197 Connect to I2 backbone network  [[BR]]
     198
     199
     200=== 3.6)  University of Michigan Site Deployment Plan ===
     2012:55pm [[BR]]
     202Morley Mao  (Michigan)  [[BR]]
     203
     204Extension plan [ 2 slides] [[BR]]
     205 Add one Airspan on top of building  [[BR]]
     206 Will signals penetrate into buildings?  [[BR]]
     207 One frequency from Clearwire  [[BR]]
     208 x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
     209 Location and backhaul [[BR]]
     210 Mobility and handover [[BR]]
     211 Planned experiments [[BR]]
     212
     213=== 3.7)  Wayne State University Site Deployment Plan ===
     2143:00pm   [[BR]]
     215Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
     216
     217Extension plan [ 2 slides] [[BR]]
     218 Plan: one site with three sectors, and 3 Airspan base stations.  [[BR]] 
     219 One frequency (10MHz) from Clearwire
     220 x3 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     221 License status [[BR]]
     222 Location and backhaul [[BR]]
     223 Mobility and handover [[BR]]
     224 Planned experiments [[BR]]
     225
     226
     227=== 3.8)  Temple University Site Deployment Plan ===
     2283:05pm   [[BR]]
     229Shan Lin, Jie Wu (Temple)  [[BR]]
     230
     231Extension plan [ 2 slides] [[BR]]
     232 x1 (or x2?) Airspan base stations (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     233 Two frequencies from Clearwire, shared with Drexel  [[BR]]
     234 Location and backhaul [[BR]]
     235 Mobility and handover [[BR]]
     236 Planned experiments [[BR]]
     237
     238=== 3.9)  Drexel University Site Deployment Plan ===
     2393:10pm   [[BR]]
     240Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
     241
     242Extension plan [ 2 slides] [[BR]]
     243 x1 (or x2?) Airspan base stations (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     244 Two frequencies from Clearwire, shared with Drexel  [[BR]]
     245 Location and backhaul [[BR]]
     246 Mobility and handover [[BR]]
     247 Planned experiments [[BR]]
     248
     249=== 3.10) UMass Amherst Site Update ===
     2503:15pm   [[BR]]
     251Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
    196252
    197253Status [ 2 slides]  [[BR]]
    198254 Add OMF/OML  [[BR]]
    199255 Connect to I2 backbone network  [[BR]]
    200 
    201 
    202 === 3.6)  University of Michigan Site Deployment Plan ===
    203 2:55pm [[BR]]
    204 Morley Mao  (Michigan)  [[BR]]
    205 
    206 Identified several roof-top locations;  aesthetics approval required.  [[BR]]
    207 Will signals penetrate into buildings?  [[BR]]
    208 One frequency from Clearwire
    209  x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
    210 
    211 Extension plan [ 2 slides] [[BR]]
    212  License status [[BR]]
    213  Location and backhaul [[BR]]
    214  Mobility and handover [[BR]]
    215  Planned experiments [[BR]]
    216 
    217 === 3.7)  Wayne State University Site Deployment Plan ===
    218 3:00pm   [[BR]]
    219 Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    220 
    221 Considering: one site with three sectors.  [[BR]] 
    222 One frequency (10MHz) from Clearwire
    223  x3 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    224 
    225 Extension plan [ 2 slides] [[BR]]
    226  License status [[BR]]
    227  Location and backhaul [[BR]]
    228  Mobility and handover [[BR]]
    229  Planned experiments [[BR]]
    230 
    231 [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/The%20Case%20for%20LTE.pptx  Clearwire in Detroit, and at Wayne State location]  [[BR]]
    232 
    233 === 3.8)  Temple University Site Deployment Plan ===
    234 3:05pm   [[BR]]
    235 Shan Lin, Jie Wu (Temple)  [[BR]]
    236 
    237 Two frequencies from Clearwire, shared with Drexel  [[BR]]
    238  x2? (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    239 
    240 Extension plan [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13%20temple%20%20%20GENI.ppt slides] [[BR]]
    241  License status [[BR]]
    242  Location and backhaul [[BR]]
    243  Mobility and handover [[BR]]
    244  Planned experiments [[BR]]
    245 
    246 === 3.9)  Drexel University Site Deployment Plan ===
    247 3:10pm   [[BR]]
    248 Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
    249 
    250 Two frequencies from Clearwire, shared with Temple [[BR]]
    251  x2? (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    252 
    253 Extension plan [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13%20%20drexel%20%20GENI.ppt slides] [[BR]]
    254  License status [[BR]]
    255  Location and backhaul [[BR]]
    256  Mobility and handover [[BR]]
    257  Planned experiments [[BR]]
    258 
    259 === 3.10) UMass Amherst Site Update ===
    260 3:15pm   [[BR]]
    261 Mike Zink, Cong Wang (UMass Amherst)  [[BR]]
    262 
    263 Status [ 2 slides]  [[BR]]
    264  Add OMF/OML  [[BR]]
    265  Connect to I2 backbone network  [[BR]]
    266  Planned experiments [[BR]]
     256 Planned experiments:  use to integrate GIMI tools [[BR]]
    267257
    268258
     
    271261Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
    272262
    273 Status [ 1 slides]  [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13-WIMAX-NYUPOLY.pdf slides][[BR]]
    274  Add OMF/OML  [[BR]]
    275  Connect to I2 backbone network  [[BR]]
    276  Planned experiments [[BR]]
     263Status [ 1 slides]  [[BR]]
     264  Planned experiments [[BR]]
    277265
    278266