Changes between Version 12 and Version 13 of GEC14Agenda/WiMAXDeploymentsAndExperiments


Ignore:
Timestamp:
06/28/12 09:36:19 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC14Agenda/WiMAXDeploymentsAndExperiments

    v12 v13  
    3232=== 2.1)  Co-exist with Clearwire ===
    33331:35pm  [[BR]]
    34 Moderator:  Harry Mussman  (GPO) and Ray Raychaudhuri (WINLAB)
     34Harry Mussman  (GPO) and Ray Raychaudhuri (WINLAB)
    3535
    3636Summary of license arrangements, some limited to 1 year, up to $4k to renew  [[BR]]
     
    4343
    4444=== 2.2)  Netspan Network Management System for Airspan Base Station ===
    45 1:40pm
    46 Moderator:  Manu Gosain  (GPO)
     451:40pm  [[BR]]
     46Moderator:  Manu Gosain  (GPO)  [[BR]]
    4747
    4848Add Netspan system at each site  [[BR]]
     
    5454
    5555=== 2.3)  Updated/new WiMAX RF AggMgr ===
    56 1:45pm
    57 Moderator:  Ivan Seskar  (WINLAB)
     561:45pm  [[br]]
     57Ivan Seskar  (WINLAB)
    5858
    5959Update WiMAX RF AggMgr for NEC base station  [[BR]]
     
    6363=== 2.2)  Add mobility/handover functions  ===
    64641:55pm  [[BR]]
    65 Moderator:  Parmesh Ramanathan  (Wisconsin)  [[BR]]
     65Parmesh Ramanathan  (Wisconsin)  [[BR]]
    6666
    6767Projects requiring handover include:  Clemson, Wayne State and Wisconsin.    [[BR]]
     
    7474=== 2.3)  Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" ===
    75752:00pm  [[BR]]
    76 Moderator:  Manu Gosain (GPO) and Ivan Seskar  (WINLAB) [[BR]]
     76Manu Gosain (GPO) and Ivan Seskar  (WINLAB) [[BR]]
    7777
    7878[2  slides]  [[BR]]
    7979
    80 === 2.8) Add OMF/OML ===
     80=== 2.8) Add OMF/OML to WiMAX Sites ===
    81812:05pm  [[BR]]
    8282Manu Gosain (GPO), Fraida Fund (NYU Poly), Giovanni Pau (UCLA)  [[BR]]
     
    8989
    9090
    91 === 2.9)  Connect to I2 Backbone Network ===
     91=== 2.9)  Connect WiMAX Sites to I2 Backbone Network ===
    92922:15pm  [[BR]]
    9393Manu Gosain (GPO), Fraida Fund (NYU Poly), Ivan Seskar (WINLAB)  [[BR]]
     
    9595Connect a WiMAX site to the GENI I2 backbone network  [[BR]]
    9696 Update WiMAX RF Agg Mgr to map MS groups into VLAN tags [[BR]]
    97  Add Cisco switch  [[BR]]
     97 Add switch  [[BR]]
    9898 Connect switch to I2 backbone  [[BR]]
    9999 Mesh of VLAN connections in I2 backbone  [[BR]]
     
    115115
    116116Discussions with Sprint about unlocked HTC Evo handset[[BR]]
     117Possible:  Sprint MVNO arrangement for pay-as-you-go data service  [[BR]]
    117118
    118119
     
    144145Ivan Seskar (WINLAB) [[BR]]
    145146
    146  Retain at WINLAB:  NEC BS in sandbox [[BR]]
    147 
    148 At WINLAB:  Replace NEC BS on roof with Airspan BS (currently at WINLAB)  [[BR]]
    149  Experimental license:  2610MHz (10MHz) [[BR]]
    150  x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    151 
    152 At Bush Campus:  Install Airspan BS [[BR]]
    153  Experimental license:  2690MHz (10MHz) [[BR]]
    154  x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    155 
    156147Status [1  slides]  [[BR]]
    157148 Bringup Airspan  [[BR]]
     
    163154Mario Gerla, Giovanni Pau (UCLA) [[BR]]
    164155
    165 Add x1 Airspan BS near UCLA dormitories;  possibly other BSs.  [[BR]] 
     156Extension plan [ 4 slides] [[BR]]
     157 Add x1 Airspan BS near UCLA dormitories;  possibly other BSs.  [[BR]] 
    166158 x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    167 
    168 Extension plan [ 4 slides] [[BR]]
    169159 License status [[BR]]
    170160 Location and backhaul [[BR]]
    171161 Mobility and handover [[BR]]
    172162 Planned experiments [[BR]]
    173 
    174 Status [ 2 slides]  [[BR]]
    175163 Add OMF/OML  [[BR]]
    176164 Connect to I2 backbone network  [[BR]]
    177 
    178 Status: [[BR]]
    179  Frequencies  [[BR]]
    180   Proceeding with renewal of the 2 granted licenses [[BR]]
    181 
    182  Connection to Backbone [[BR]]
    183   Have Open Flow Switch [[BR]]
    184   Fiber expected this month [[BR]]
    185   Connection beginning of April [[BR]]
    186 
    187  AIRSPAN BS [[BR]]
    188   Expected shortly [[BR]]
    189   Location selected [[BR]]
    190   Facilities contacted to prepare site.  [[BR]]
    191 
    192  Clients: [[BR]]
    193   Ordered 35 Clients from Derek, waiting for them [[BR]]
    194 
    195 
    196 
    197165
    198166=== 3.4)  Clemson University Site Deployment Plan ===
     
    201169[http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13-WiMAX-Clemson.pdf Clemson slides][[BR]]
    202170
    203 Add x1 Airspan BS near campus [[BR]]
    204 Add x2 Airspan BS near Greenville;  connect via DOT fibers.  [[BR]]
    205 Want handover near I85/I385 intersection.  [[BR]]
     171
     172Extension plan [ 2 slides]  [[BR]]
     173 Add x1 Airspan BS near campus [[BR]]
     174 Add x2 Airspan BS near Greenville;  connect via DOT fibers.  [[BR]]
     175 Want handover near I85/I385 intersection.  [[BR]]
    206176 x3 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
    207 
    208 [ 2 slides]  [[BR]]
    209 Extension plan [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/GEC13-WiMAX-Clemson.pdf slides] [[BR]]
    210177 License status [[BR]]
    211178 Location and backhaul [[BR]]