Changes between Version 31 and Version 32 of GEC14Agenda/IMDesignTopics
- Timestamp:
- 07/03/12 10:40:15 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC14Agenda/IMDesignTopics
v31 v32 70 70 * Next steps, during Spiral 5 [[BR]] 71 71 72 * For more information, a udit [http://groups.geni.net/geni/wiki/GIMIv1.0Tutorial GIMI v1.0 tutorial] [[BR]]72 * For more information, attend or audit [http://groups.geni.net/geni/wiki/GIMIv1.0Tutorial GIMI v1.0 tutorial] [[BR]] 73 73 74 74 … … 111 111 * Next steps, during Spiral 5 [[BR]] 112 112 113 * For more information, a udit [http://groups.geni.net/geni/wiki/GEMINITutorial GEMINI v1.0 tutorial] [[BR]]113 * For more information, attend or audit [http://groups.geni.net/geni/wiki/GEMINITutorial GEMINI v1.0 tutorial] [[BR]] 114 114 115 115 … … 153 153 * Define, prototype, deploy and operate a GENI User Workspace. [[BR]] 154 154 * Gather the various "user tools" that have been implemented to date, and fit them into GENI User Workspace Service so that GENI I&M users can begin to conveniently conduct experiments or instrument infrastructure. [[BR]] 155 * So that the GENI User Workspacet can be hosted on a server dedicated to the user (even the user's laptop), provide on a portable VM. [[BR]]155 * So that the GENI User Workspacet can be hosted on a server dedicated to the user (even the user's laptop), provide on a Virtual Box "portable VM". [[BR]] 156 156 * Use the "GENI User Workspace" to test the GIMI and GEMINI tools, and during their tutorials. [[BR]] 157 157 … … 340 340 Goals 341 341 * Both GIMI and GEMINI tools should be available to Users during this period [[BR]] 342 * Acceptance testing by the GPO (Jeanne Ohren) [[BR]] 342 343 * Bug tracking system, plus periodic bug fixes (who are leads?) [[BR]] 343 * Acceptance testing by the GPO (Jeanne Ohren)[[BR]]344 * How can we facilitate feedback from Users, after EVERY use? [[BR]] 344 345 345 346 * Both GIMI and GEMINI must provide a high level of support to Users [[BR]]