185 | | NOTE: Only 2 slides! [[BR]] |
186 | | |
187 | | Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] |
188 | | Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] |
189 | | Choice of frequency: [[BR]] |
190 | | (2510 Lo: 2496MHz to 2570MHz) [[BR]] |
191 | | (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
192 | | (2510 Hi: 2620MHz to 2690MHz) [[BR]] |
193 | | (3650: 3650MHz to 3700MHz)] [[BR]] |
194 | | Issues you face. [[BR]] |
195 | | Link to your plan. [[BR]] |
| 183 | Add x1 Airspan BS near campus [[BR]] |
| 184 | Add x2 Airspan BS near Greenville; connect via DOT fibers. |
| 185 | |
| 186 | Want handover near I85/I385 intersection. [[BR]] |
| 187 | |
| 188 | Utilize Clemson existing Educational Broadband Services (EBS) license? [[BR]] |
| 189 | |
203 | | Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] |
204 | | Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] |
205 | | Choice of frequency: [[BR]] |
206 | | (2510 Lo: 2496MHz to 2570MHz) [[BR]] |
207 | | (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
208 | | (2510 Hi: 2620MHz to 2690MHz) [[BR]] |
209 | | (3650: 3650MHz to 3700MHz)] [[BR]] |
210 | | Issues you face. [[BR]] |
211 | | Link to your plan. [[BR]] |
212 | | |
| 197 | Considering expansion to two possible locations: Madison Metro; and Dept of ? near Capitol. |
| 198 | |
| 199 | x1 (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
| 200 | |
| 201 | Connect via Madison unified fiber project [[BR]] |
| 202 | Outside contributions for power and poles. [[BR]] |
220 | | Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] |
221 | | Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] |
222 | | Choice of frequency: [[BR]] |
223 | | (2510 Lo: 2496MHz to 2570MHz) [[BR]] |
224 | | (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
225 | | (2510 Hi: 2620MHz to 2690MHz) [[BR]] |
226 | | (3650: 3650MHz to 3700MHz)] [[BR]] |
227 | | Issues you face. [[BR]] |
228 | | Link to your plan. [[BR]] |
| 210 | No EBS license; working with Wayne State on licenses. [[BR]] |
| 211 | |
| 212 | Identified several roof-top locations; aesthetics approval required. [[BR]] |
| 213 | |
| 214 | Will signals penetrate into buildings? [[BR]] |
236 | | Outline basic deployment plan for Year 1, including access facilities and switches, plus associated servers. [[BR]] |
237 | | Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license. [[BR]] |
238 | | Choice of frequency: [[BR]] |
239 | | (2510 Lo: 2496MHz to 2570MHz) [[BR]] |
240 | | (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
241 | | (2510 Hi: 2620MHz to 2690MHz) [[BR]] |
242 | | (3650: 3650MHz to 3700MHz)] [[BR]] |
243 | | Issues you face. [[BR]] |
244 | | |
| 222 | Considering: one site with three sectors; three separated sites. [[BR]] |
| 223 | |
| 224 | Wayne State had EBS spectrum in 2.6GHz band, but leased out to Clearwire. [[BR]] |
| 225 | Talking with Clearwire about loan of frequencies; concerns about their need to change frequencies, and radiation into Canada. [[BR]] |
| 226 | |
| 227 | Possibly consider 3.65GHz band, with Intel 6250 modem, where no interference? Concerns about: coverage; lack of MS devices. [[BR]] |