Changes between Version 36 and Version 37 of GEC12WiMaxDeploymentAndExperimentation


Ignore:
Timestamp:
01/11/12 15:21:05 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC12WiMaxDeploymentAndExperimentation

    v36 v37  
    123123Pole for mounting [[BR]]
    124124DC power supply (-48v, approx 300W) [[BR]]
    125 Ethernet cable, from base station unit (outside) to testbed (inside) [[BR]]
     125Ethernet cable, from base station unit (outside) to testbed (inside);  consider copper (may be a problem with lightning surge) or fiber (requires MM fiber cable, and fiber interface on switch) [[BR]]
    126126Windows server to host network management software [[BR]]
    127127Linux server to host OMF software [[BR]]
     
    159159NOTE:  Only 2 slides!  [[BR]]
    160160
    161 Outline basic deployment plan for Year 1, including access facilities and switches,  plus associated servers.  [[BR]]
    162 Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.  [[BR]] 
    163 Choice of frequency:  [[BR]]
    164   (2510 Lo:  2496MHz to 2570MHz)   [[BR]]
    165   (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    166   (2510 Hi:  2620MHz to 2690MHz)  [[BR]]
    167   (3650: 3650MHz to 3700MHz)]  [[BR]]
    168 Issues you face. [[BR]]
    169 Link to your plan.  [[BR]]
     161At WINLAB:  Replace NEC BS on roof with Airspan BS (currently at WINLAB)  [[BR]]
     162Retain at WINLAB:  NEC BS in sandbox [[BR}}
     163
     164At Bush Campus:  Install Airspan BS [[BR]]
     165Choice of frequency: 2610MHz [[BR]]
     166
     167x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     168
    170169
    171170=== 3.2)  UCLA Site Extension Plans ===
     
    175174[http://groups.geni.net/geni/attachment/wiki/GEC12WiMaxDeploymentAndExperimentation/110411%20%20UCLA%20%20WiMAX%20%20BBN-GENI-GEC12.ppt  slides]  [[BR]]
    176175
    177 Outline basic deployment plan for Year 1, including access facilities and switches,  plus associated servers.  [[BR]]
    178 Status of application to FCC for experimental license, or utilize existing campus Educational Broadband Services (EBS) license.  [[BR]] 
    179 Choice of frequency:  [[BR]]
    180   (2510 Lo:  2496MHz to 2570MHz)   [[BR]]
    181   (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    182   (2510 Hi:  2620MHz to 2690MHz)  [[BR]]
    183   (3650: 3650MHz to 3700MHz)]  [[BR]]
    184 Issues you face. [[BR]]
    185 Link to your plan.  [[BR]]
     176Add x1 Airspan BS near UCLA dormitories;  possibly other BSs.  [[BR]] 
     177Choice of frequency:  2572MHz [[BR]]
     178
     179x1  (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    186180
    187181=== 3.3)  Clemson University Site Deployment Plan ===