Changes between Version 3 and Version 4 of GEC11WiMAXCampusDeployment


Ignore:
Timestamp:
07/20/11 17:12:53 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC11WiMAXCampusDeployment

    v3 v4  
    1818The projects involved in deploying WiMAX base stations will review their current status and progress towards their Spiral 3 roadmap goals of completing a basic mobility experiment and using OMF/OML to support GENI experimenters.  [[BR]]
    1919
    20 == Attendees ==
     20== Agenda ==
     21
     22=== Introductions  ===
     233:30pm
     24 
    2125
    2226  BBN Technologies   Harry Mussman, Manu Gosain, Hamed Soroush [[BR]]
     
    3034  Wisconsin   Derek Meyer [[BR]]
    3135
    32 == Agenda ==
    33 
    34 == Introductions  ==
    35 3:30pm
    36  
    3736
    3837=== Deployment Summary ===
    39383:35pm
    40 
    4139  On March 17:  [[BR]]
    4240
     
    5654
    5755=== WiMAX Range and Throughput Experiment and Measurements ===
    58 3:40pm
    5956
    60   Columbia University (1770)    PI: Henning Schulzrinne,  Sung-Hoon Seo and Jan Janak: [[BR]]
     57  Columbia University (1770)    PI: Henning Schulzrinne,  Sung-Hoon Seo and Jan Janak [[BR]]
    6158  3:40pm [[BR]]
    6259  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
    6360
    6461  Polytechnic Institute of NYU (1751)   PI: Thanasis Korakis   [[BR]]
     62  3:50pm [[BR]]
     63  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
     64
     65  UCLA (1797)   PI: Mario Gerla, Giovanni Pau    [[BR]]
     66  4:00pm [[BR]]
     67  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
     68 
     69  Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  [[BR]]
     70  4:05pm [[BR]]
     71  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
     72
     73  UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    [[BR]]
     74  4:15pm [[BR]]
     75  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
     76       
     77  Wisconsin (1724)      PI: Suman Banerjee and Derek Meyer:  [[BR]]
     78  4:25pm [[BR]]
     79  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
     80       
     81  BBN Technologies, Cambridge MA  Hamed Soroush, Manu Gosain and Harry Mussman:  [[BR]]
     82  4:35pm [[BR]]
    6583  Four slides:  Base Station configuration;  range and throughput experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
    6684
    6785
    68   UCLA (1797)   PI: Mario Gerla, Giovanni Pau    [[BR]]
    69   [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/UCLA-WIMAX-ProjectReview-Mar-2011.pptx  slides]  [[BR]]
    70   Seeing 14Mb/s DL, 2 - 3 Mb/s UL;  connect to vehicle up to 300 m;  client always receives, but cannot always connect;  helped by setting client IP address;  windows client works better than Linux client.  [[BR]]
    71   Poster from demo session:  [  poster]  [[BR]]
    72  
    73   Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder  [[BR]]
    74   Studying U Colorado private network, built by Airspan.  [[BR]]
    75   Starting data modeling using Anritsu MS2721B with WiMAX demodulator;  acquiring propagation based model from Airspan deployment.  [[BR]]
    76   Reference:  Airspan plan for U Colorado [http://groups.geni.net/geni/attachment/wiki/ClusterECall022311/UoC%20-%20MacroMAXe%20RF%20Plan%20V1.1.pptx  slides].  [[BR]]
    77   Reference:  MS thesis on "Field Study of WiMAX Performance"  [[BR]][http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Gronsund_Pal_master.pdf  text]. [[BR]]
    78 
    79   UMass Amherst (1731)  PI:  Mark Corner, Brian Lynn    [[BR]]
    80   NA
    81   Issue:  Would like coverage to downtown Amherst, 1 mi away;  can this be done?  [[BR]]
    82   Issue:  Can antenna be moved outside of bus for better range? Check with how UW Madison puts antennas on buses.   [[BR]]
    83        
    84   Wisconsin (1724)      PI: Suman Banerjee and Derek Meyer:  [[BR]]
    85   Using dongle with Windows 7 PC;  seen RSSI from -40 dbm down to -60 dbm;  have seen connectivity up to 300 yds. [[BR]]
    86   Existing Cisco system:  Connectivity to buses, equipped with large client antenna, up to 500M, for coverage over 1.25 sq mi.[[BR]]
    87   Poster from demo session:  [  poster]  [[BR]]
    88 
    89        
    90   BBN Technologies, Cambridge MA  Hamed Soroush, Manu Gosain and Harry Mussman:  [[BR]]
    91   [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/031711%20%20BBNWiMAXRangeThroughMeas.ppt  slides]  [[BR]]
    92   Range and throughput experiment uses script in mobile station and server behind base station to evaluate connection with ping and iperf.
    93   Seeing good throughput (up to 14Mb/s DL and 1 - 2 Mb/s UL) to 0.25 mi, but not yet further. 
    94   Soon, will vary BTS and iperf parameters to see if can find a set for greater distances at lower rates. 
    95   Do not expect range beyond 0.6mi. [[BR]]
    96 
    97 
    9886=== Measurements and Experimenter Support Summary ===
     874:40pm
    9988
    10089  On March 17:  [[BR]]
     
    116105  Have established an experiment exchange and experimenter mailing list, at [http://groups.geni.net/geni/wiki/WiMAXExper]   [[BR]]
    117106 
    118   MIT experiments, using BBN BTS:  evaluate ARQ and HARQ changes to better support video streaming
    119 
    120107  Clemson experiments, using BBN and/or Rutgers  BTS:  evaluate DOS attack susceptibility
    121108
    122109  Two experiments being planned at NYU Poly:  [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/OtherExperiments%20%20%20NYU%20Poly%20%20Korakis_GENI_WiMAX_GEC10.ppt  slides]
    123110
    124 
    125 
    126 
    127 
    128 
    129 
    130 
    131 
     111  MIT experiments, using BBN and UCLA sites:  evaluate ARQ and HARQ changes to better support video streaming
     112  Danail Traskov (MIT)
     113  4:45pm
     114  Four slides:  Experiment goal;  experiment configuration;  Mobile Station code/script;  measurement results and conclusions [[BR]]
    132115
    133116
    134117=== Spiral 3 Roadmap  ===
     1184:55pm
    135119
    136120  This roadmap shows the original and *current goals that apply to the GENI WiMAX projects:
     
    154138
    155139
     140
     141
     142
     143
     144
     145
    156146== WiMAX Developer Support ==
    157147