Changes between Version 24 and Version 25 of GEC10WiMaxCampusDeployment
- Timestamp:
- 04/04/11 14:54:41 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC10WiMaxCampusDeployment
v24 v25 52 52 53 53 Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder [[BR]] 54 Status: [http://groups.geni.net/geni/attachment/wiki/GEC10WiMaxCampusDeployment/Colorado%20-%20Status%20-%20March%20-%202011.pptx slides] [[BR]] 55 Summary: NEC BTS installed, and ready for turnup. Operating in A4/B4 block; also Clearwire; also U Colorado private network, built by Airspan. Starting data modeling using Anritsu MS2721B with WiMAX demodulator; acquiring propagation based model from Airspan deployment. [[BR]] 56 References: Airspan plan for U Colorado [ slides]. MS thesis on "Field Study of WiMMX Performance" [ text]. 54 57 55 email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]] 58 59 email from Dirk: We've changed the mounting location because we think the wind profile of the antenna makes the mounting system on top of the other building questionable. We regularly get 40-60mph winds this time of year.[[BR]] 56 60 57 61 We've already selected the new location. It's one of the two locations where our campus is installing their own WiMAX equipment. There is a spare pole & mount already in place, so that simplifies installation. We have to install the "IDU" in a weatherized metal enclosure. Installation starts next Monday. The parts have been ordered this week & installation is being done by our campus IT group and professional building maintenance people.[[BR]]