Changes between Version 38 and Version 39 of Embedded Real-Time Measurements


Ignore:
Timestamp:
10/14/09 11:46:25 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Embedded Real-Time Measurements

    v38 v39  
    7676'''''Milestone 5'':'''
    7777
    78 This milestone discusses the development of experimental designs for use-cases based on previous work on a measurement-driven cross-layer communication system.
     78Support GPO in developing an experimental use-case (completed 09/01/2009)
     79
     80The goal of this milestone was to support the GPO in developing experimental designs for usecases
     81based on our work on a measurement-driven cross-layer communication system. Building
     82on the successful simulation work with the modules developed in [erm09_1], we validate our
     83cross-layer communication schemes in developing an experimental use-case based on proactive
     84packet protection. We show network simulations, as well as an experimental demonstration, of
     85our packet protection scheme. Additional information, as well as a technical note, on milestone 5
     86is available online [erm09_1], [erm09_2].
    7987
    8088The release of this milestone document was postponed until after the proceedings of the European Conference on Optical Communication were published (end of September 2009).