Changes between Version 35 and Version 36 of Embedded Real-Time Measurements


Ignore:
Timestamp:
09/01/09 15:32:02 (15 years ago)
Author:
caroline@ee.columbia.edu
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Embedded Real-Time Measurements

    v35 v36  
    7474''[http://groups.geni.net/geni/attachment/wiki/Embedded%20Real-Time%20Measurements/GENI_MS4_ERM_June09_v1-0.pdf Technical Note MS4]''
    7575
     76'''''Milestone 5'':'''
     77
     78This milestone discusses the development of experimental designs for use-cases based on previous work on a measurement-driven cross-layer communication system.
     79
     80The release of this milestone document has been postponed until after the proceedings of the European Conference on Optical Communication have been published (end of September 2009).
     81
     82'''''Milestone 6'':'''
     83
     84We have evaluated various control frameworks to assess the feasibility of joining a GENI cluster and integrating our work on real-time measurements within one of these clusters. In this milestone, we discuss this endeavor and our recent decision to join the Cluster D ORCA team.
     85
     86''[http://groups.geni.net/geni/attachment/wiki/Embedded%20Real-Time%20Measurements/GENI_MS6_ERM_Sept09_v1-0.pdf Technical Note MS6]''
     87
    7688'''Project Technical Documents'''
    7789