Changes between Version 13 and Version 14 of DOME
- Timestamp:
- 01/14/09 14:33:09 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
DOME
v13 v14 57 57 '''Project Technical Documents''' 58 58 59 [http://groups.geni.net/geni/attachment/wiki/DOME/DOME_SubstrateCatalog.pdf DOME Substrate Catalog, 2008][[BR]]59 [http://groups.geni.net/geni/attachment/wiki/DOME/DOME_SubstrateCatalog.pdf DOME Substrate Description, 2008][[BR]] 60 60 61 61 '''Quarterly Status Reports''' … … 65 65 '''Spiral 1 Connectivity''' 66 66 67 Location of equipment: For Spiral 1, all work will be done via a lab at UMassAmherst. However, the intention of this project is deploy equipment on mobile nodes in !DieselNet. (See [http://groups.geni.net/geni/attachment/wiki/DOME/DOME_SubstrateCatalog.pdf DOME Substrate Catalog] for a description of all hardware, and see [http://prisms.cs.umass.edu/dome DOME Web Site] for a description of !DieselNet's current deployment.). Some engineering to prepare for mobile deployment will also be conducted during Spiral 1.67 Location of equipment: For Spiral 1, all work will be done via a lab at UMassAmherst. However, the intention of this project is deploy equipment on mobile nodes in !DieselNet. (See [http://groups.geni.net/geni/attachment/wiki/DOME/DOME_SubstrateCatalog.pdf DOME Substrate Description] for a description of all hardware, and see [http://prisms.cs.umass.edu/dome DOME Web Site] for a description of !DieselNet's current deployment.). Some engineering to prepare for mobile deployment will also be conducted during Spiral 1. 68 68 69 69 Layer 3 Connectivity: IP access will be through UMass Amherst's campus network, using their public IP addresses.