| 1 | === R6) Connect WiMAX sites to I2 backbone network, to support multi-site experiments === |
| 2 | Manu Gosain (GPO), Fraida Fund (NYU Poly), Ivan Seskar (WINLAB) [[BR]] |
| 3 | |
| 4 | * Connect a WiMAX site to the GENI I2 backbone network [[BR]] |
| 5 | * Update WiMAX RF Agg Mgr to map MS groups into VLAN tags [[BR]] |
| 6 | * Add switch [[BR]] |
| 7 | * Connect switch to I2 backbone [[BR]] |
| 8 | * VLAN connections from each site to "L2 router" at WINLAB [[BR]] |
| 9 | |
| 10 | [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WiMAXSiteConnectivity%20%200710wimaxmeeting14gec.ppt slide] [[BR]] |
| 11 | |
| 12 | * When can other WiMAX sites can be added? [[BR]] |
| 13 | * UCLA; has physical connection; needs to configure; when? [[BR]] |
| 14 | * Wisconsin; when? [[BR]] |
| 15 | * Clemson; when? [[BR]] |
| 16 | * UMass Amherst; has physical connection; needs to configure; when? [[BR]] |
| 17 | |
| 18 | * How is core network configured to support multi-site experiments? [[BR]] |
| 19 | |
| 20 | * How is new Data-path GW Srvc use at site to interface with core network? [[BR]] |
| 21 | |
| 22 | What are next steps? (Manu Gosain) [[BR]] |
| 23 | * Establish planned configuration (due 11/15/12) [[BR]] |
| 24 | * Establish plan with schedule to connect all sites (due 11/15/12) [[BR]] |
| 25 | * Track connection of sites, and assist them as needed [[BR]] |